← Back to NASA Technology Projects

Orbital Debris Impact Sensor Engineering Model

Completed TRL 3 (started at 3, targeting 3)

Description

This project is to develop an engineering model (prototype) of an orbital debris impact sensor suitable for developmental integration testing as a payload for the Aggiesat6 spacecraft. The purpose of the sensor is to collect data on debris objects ranging in size from 0.5 to 3 mm, which are difficult to measure by other means.

The prototype would be developed in cooperation with the Texas A&M University AggieSat Lab to fit available constraints in size, shape, power, and data interfaces. This effort leverages development and testing from previous and current projects sponsored by the JSC Technology Working Group, including HIMS and DRAGONS. Follow-on work would develop a flight article designed to collect calibrated data on the velocity and size of debris impacts when attached to a small satellite in low Earth orbit.

Benefits

Gain experience in development of flight-like sensors.

Details

Technology areaCommunications, Navigation, and Orbital Debris Tracking and Characterization Systems > Networking and Ground-Based Orbital Debris Tracking and Management > Orbital Debris Characterization
ProgramCenter Innovation Fund: JSC CIF (JSC CIF)
Lead organizationJohnson Space Center, Houston, TX
Start date2012-10-01
End date2013-09-01

Project contacts

Listed on TechPort itself — the most direct way to ask about this specific project.

How to get involved

This is early/mid-stage (TRL 3) — the most realistic path in is NASA SBIR/STTR, which funds small businesses and research institutions to develop technology aligned with NASA's needs (equity-free, phased funding). Check whether a current SBIR/STTR solicitation topic overlaps with this project's technology area, or contact the project directly (above) to ask.

None of these are guaranteed paths for this specific project — TechPort itself doesn't have an "apply" button. Reaching out to the contact(s) above with a specific question is usually the fastest way to find out what's actually open.