← Back to NASA Technology Projects
Distributed Pyro Initiation System Project
Completed
TRL 6 (started at 4, targeting 6)
Description
Evaluate Current State of the Art; Define Critical Performance Requirements; Select Components; Smart Initiator or Smart Connector; Perform Detailed Cost/Benefit Analysis; Develop System Architecture; Build Prototype System; Qualify Prototype System to TRL 6; Develop Full Qualification Plan for implementation on JPL Flight Project.
Benefits
We propose to replace the existing massive cable system with a simpler and much lighter "bussed" system significantly reducing cable mass and complexity. This can be used for a large range of NASA missions improving reliability and reducing mass.
Details
| Program | Center Innovation Fund: JPL CIF (JPL CIF) |
| Lead organization | Jet Propulsion Laboratory, Pasadena, CA |
| Start date | 2012-10-01 |
| End date | 2013-10-01 |
Project contacts
Listed on TechPort itself — the most direct way to ask about this specific project.
How to get involved
This is early/mid-stage (TRL 6) — the most realistic path in is NASA SBIR/STTR, which funds small businesses and research institutions to develop technology aligned with NASA's needs (equity-free, phased funding). Check whether a current SBIR/STTR solicitation topic overlaps with this project's technology area, or contact the project directly (above) to ask.
None of these are guaranteed paths for this specific project — TechPort itself doesn't have an "apply" button. Reaching out to the contact(s) above with a specific question is usually the fastest way to find out what's actually open.