← Back to NASA Technology Projects

Game Changing Usage of High-Voltage Power Transmission Systems as Extremely Large Antennas for Space Physical and Geophysical Remote Imaging Project

Completed TRL 3 (started at 1, targeting 6)

Description

We use the US high-voltage power transmission system as an extremely large antenna to extract unprecedented spatiotemporal space physical and geological information from distributed geomagnetically induced current (GIC) observations. The power grid impacts are presently the highest space weather concern in US and Federal Energy Regulatory Commission’s ongoing regulatory action will drive substantial industry and federal interests in the GIC problem in the near future. Consequently, the game changing GIC observations set up offers not only opportunity for new big heliophysics science utilizing industrial structures but also potential for major interagency and public-private collaborations.
 

Geomagnetic storms drive geomagnetically induced currents (GIC) in high-voltage power transmission systems worldwide. GIC distribution in the transmission system is a function of the large-scale surface geoelectric field and DC characteristics of the transmission system. Geoelectric field carries information about magnetospheric-ionospheric electric current systems and geological structures. It is common to use information about magnetospheric-ionospheric electric current systems or geomagnetic field variations on the ground together with geological and transmission system description to model GIC. However, no work or technology exists for inverting spatiotemporal space physical and geological information from extensive distributed GIC observations.

We will utilize the US high-voltage power transmission system for the first time as a science tool to map large scale GIC’s. Large-scale application of the set up will allow unprecedented, game changing, extraction of space physical and geological information over wide range of spatial and temporal scales. Further, the new GIC observation set up can be turned into a valuable resource for the power transmission industry. We envision that the large-scale implementation of the concept can be carried out in collaboration with the industry and other federal agencies after the second year medium deployment phase. With sufficient funds, full-scale implementation of the concept with a larger number of GIC observation sites can be achieved within 3-4 years after the medium scale deployment phase.
 

Benefits

The new technology allows extraction of space physical and geophysical research information from the observed GICs. This unprecedented spatiotemporal space physical information can be used to assist the analysis of data from NASA heliophysics missions.

The potential application for this technology is the real-time monitoring of large-scale GIC distribution in the US power grid. Real-time information about GIC is of interest also, for example, to NOAA, DHS and DOE.

Details

Technology areaAerospace Power and Energy Storage > Power Management and Distribution > Distribution and Transmission
ProgramCenter Independent Research & Development: GSFC IRAD (GSFC IRAD)
Lead organizationGoddard Space Flight Center, Greenbelt, MD
Start date2013-10-01
End date2015-09-01

Project contacts

Listed on TechPort itself — the most direct way to ask about this specific project.

How to get involved

This is early/mid-stage (TRL 3) — the most realistic path in is NASA SBIR/STTR, which funds small businesses and research institutions to develop technology aligned with NASA's needs (equity-free, phased funding). Check whether a current SBIR/STTR solicitation topic overlaps with this project's technology area, or contact the project directly (above) to ask.

None of these are guaranteed paths for this specific project — TechPort itself doesn't have an "apply" button. Reaching out to the contact(s) above with a specific question is usually the fastest way to find out what's actually open.