← Back to NASA Technology Projects

Triton Hopper: Exploring Neptune's Captured Kuiper Belt Object

Completed TRL 3 (started at 2, targeting 3)

Description

Phase II for the Triton Hopper will focus on retiring the risks identified in Phase I and providing better detail and alternate conceptual options. The three main risks to be addressed include Triton hopper mission, propellant collection, and propulsion performance. For the Triton mission both delivery to Triton in a timely manner ~ 15 yrs and safe takeoff and landing of the hopper on the Triton terrain will be explored. For propellant collection a bevameter experiment will be performed on a small sample of frozen nitrogen to assess ways to best gather the frozen nitrogen propellant. For the propulsion performance ways will be explored to heat the propellant to higher temperatures and or to reduce dry mass to enable further hops. Using these three products two Compass concurrent engineering runs will be performed; the first of which focusses on integrating the findings of mission/propellant collection and the second on integrating the findings which increase hop distance. Phase II will end with roadmapping technology development solutions as well as using such techniques for other icy worlds to gather propellants for hopping.

Benefits

This project hopes to develop new methods of exploration of icy worlds.

Details

Technology areaRobotic Systems
ProgramNASA Innovative Advanced Concepts (NIAC)
Lead organizationGlenn Research Center, Cleveland, OH
Start date2018-06-01
End date2020-05-31

Project contacts

Listed on TechPort itself — the most direct way to ask about this specific project.

How to get involved

This is early/mid-stage (TRL 3) — the most realistic path in is NASA SBIR/STTR, which funds small businesses and research institutions to develop technology aligned with NASA's needs (equity-free, phased funding). Check whether a current SBIR/STTR solicitation topic overlaps with this project's technology area, or contact the project directly (above) to ask.

None of these are guaranteed paths for this specific project — TechPort itself doesn't have an "apply" button. Reaching out to the contact(s) above with a specific question is usually the fastest way to find out what's actually open.