Mars Ascent Vehicle Sizing & Habitability Assessment

Completed TRL 4 (started at 2, targeting 4)

Description

The Mars Ascent Vehicle (MAV) is the single largest indivisible payload in the Evolvable Mars Campaign (EMC). The MAV cabin size drives ascent propellant load, which in turn drives In-Situ Resource Utilization and surface power needs, Lander payload sizing, and in-space transportation architecture--all of which determines how many Earth launches will be needed. The MAV cabin must accommodate crew suit don/doff, seat ingress/egress, exercise, and cabin ingress/egress, but there is currently no relevant test data on how much volume these activities will require. This JSC collaborative project will produce detailed MELs for two MAV general arrangements as well as well as timelines for all mission phases. Specifically human factors studies would be performed with four subjects addressing different suit combinations, suit don/doffing, and window/workstations layouts, seat arrangements, sleeping accommodations, logistics stowage and utilization in two different configurations that would include a minimalist 2B lander cabin, and equivalent studies in a modified 2A cabin. Note however, this reduced scope study will not include integration of the existing AES hardware (potable water, WCS, trash management systems), or the simulation software including rendezvous, subsystems models, and time delay simulator into a multi-day habitability study. Completion of the above work would be contingent upon additional funding from other sources. The Mars Ascent Vehicle (MAV) is the largest indivisible payload and has the largest "gear ratio" in the EMC architecture, requiring between 7-15 kg of propellant to lift every kilogram of Mass of the Mars surface. For these reasons the mass and volume of the MAV cabin drives requirements for the In-Situ Resource Utilization to generate propellants, which drives the surface power needs, and which also sets the Lander payload size, which drives the in-space transportation architecture, and the number of launches and time required to land humans on Mars Surface. Some of the architectures currently under consideration in the EMC utilize a chemical/solar Electric propulsion Hybrid that inserts into a 5 sol orbit and might require that the crew spend several days in the MAV prior to rendezvous with the Mars transit vehicle. There are a wide range of opinions regarding the required size of the MAV, but no Human in the loop evaluations to generate the data necessary to inform decisions on the MAV sizing, which are critical to begin to close the various EMC architectures.

Benefits

This FY16 JSC Center level IR&D project will produce detailed MELs for two MAV general arrangements as well as well as timelines for all mission phases. Human factors studies would be performed with four subjects addressing different suit combinations, suit don/doffing, and window/workstations layouts, seat arrangements, sleeping accommodations, logistics stowage and utilization in two different configurations that would include a minimalist 2B lander cabin, and equivalent studies in a modified 2A cabin. In addition to the collaboration between the JSC Engineering Directorate, Health and Human Performance Directorate, and EISD, this project includes collaborations outside of NASA (Rhode Island School of Design), and potential cost sharing with HQ/HEOMD to enable integrated simulation and habitability study portion of objectives. NASA HQ - Potential > 100K funding through Human Spaceflight Architecture Team (HAT) NASA LaRC will allocate 0.25 FTE (Sharon Jefferies) from Space Mission Analysis Branch Rhode Island School of Design will investigate and propose alternative MAV concepts (industrial design) via a no-cost trade agreement using MAV layouts as class project,~ 500 person hours.

Details

ProgramCenter Innovation Fund: JSC CIF (JSC CIF)
Lead organizationJohnson Space Center, Houston, TX
Start date2015-10-01
End date2016-09-30

Project contacts

Listed on TechPort itself — the most direct way to ask about this specific project.

How to get involved

This is early/mid-stage (TRL 4) — the most realistic path in is NASA SBIR/STTR, which funds small businesses and research institutions to develop technology aligned with NASA's needs (equity-free, phased funding). Check whether a current SBIR/STTR solicitation topic overlaps with this project's technology area, or contact the project directly (above) to ask.

None of these are guaranteed paths for this specific project — TechPort itself doesn't have an "apply" button. Reaching out to the contact(s) above with a specific question is usually the fastest way to find out what's actually open.