← Back to NASA Technology Projects
Completed TRL 1 (started at 1, targeting 1)
The proposed development is a technology maturation effort in support of the sounding rocket program office (SRPO) objective to develop a payload capable of extended duration flight. Previous analysis has shown that a typical sounding rocket payload weight must be reduced by 20 to 30% to achieve the target science observation time above 150 km. We propose to evaluate new approaches in sounding rocket payload system architecture and design that result in weight efficiencies, to document the results and recommendations in a “white paper”, to provide a representative CAD model to demonstrate proposed component or layout re-designs, and to provide a representative payload mass properties budget using a previously flown sounding rocket payload as a basis.
Listed on TechPort itself — the most direct way to ask about this specific project.
This is early/mid-stage (TRL 1) — the most realistic path in is NASA SBIR/STTR, which funds small businesses and research institutions to develop technology aligned with NASA's needs (equity-free, phased funding). Check whether a current SBIR/STTR solicitation topic overlaps with this project's technology area, or contact the project directly (above) to ask.
None of these are guaranteed paths for this specific project — TechPort itself doesn't have an "apply" button. Reaching out to the contact(s) above with a specific question is usually the fastest way to find out what's actually open.