Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 155 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
Development and Flight-Testing of a High-Performance Electric-Pump Fed Launch Vehicle Completed 8 Solar Thermal Propulsion Ventions, LLC 2025-12-18 —
Simulation of Neutron Spectra for Lunar Prospecting, Year 1 Completed 3 Destination Resource Exploration Glenn Research Center 2025-12-18 —
Solid State Thermionic Power, Year 3 Completed 5 — Johnson Space Center 2025-12-18 —
Augmented Control of Rocket Diffuser Boundary Layer Separation Completed 4 — Stennis Space Center 2025-12-18 —
Spyder: Critical Technology Demonstration Tests Completed 8 — UP Aerospace, Inc 2025-12-18 —
Portable Knee Dynamometer Completed — — Johnson Space Center 2025-12-18 —
Enzymatic Life-Detection Sensor Completed 3 In Situ Instruments and Sensors Ames Research Center 2025-12-18 —
Novel Particle Approaches for Modeling Electrospray Propulsion Concepts Completed 3 Electrostatic Propulsion University of Illinois at Urbana-Champaign 2025-12-18 —
Quiet Fan Technology for Deep Space Missions, Year 1 Completed 6 Aeroacoustics Johnson Space Center 2025-12-18 —
Preignition Behavior and Combustion Stability of Storable Propellants for Deep Space Missions Completed 3 Earth Storable Propellants Purdue University-Main Campus 2025-12-18 —
Print-Assisted Photovoltaic Assembly (PAPA) Completed 4 Photovoltaic Electrical Power Marshall Space Flight Center 2025-12-18 —
Mach Effects for In Space Propulsion: Interstellar Mission Completed 4 Solar Thermal Propulsion Space Studies Institute 2025-12-18 —
Mars Li-CO2 Batteries Completed 3 Electrochemical Storage: Batteries Glenn Research Center 2025-12-18 —
Nitric oxide Infrared Cooling Emissions CubeSat - NICEcube Completed 3 Thermal Conditioning for Sensors, Instruments, Samples, and High-Efficiency Electric Motors Langley Research Center 2025-12-18 —
In Situ Polymerization via Environmentally-Borne Initiation Stimuli Completed 3 Lightweight Structural Materials University of Michigan-Ann Arbor 2025-12-18 —
Evaluation of a Photon Sieve for Lidar Application, Year 2 Completed 4 Lasers Langley Research Center 2025-12-18 —
Fire Watch: Prediction and Detection of Wildfires Through Advanced AI/ML Completed 6 Fire Detection, Suppression, and Recovery — 2025-12-18 —
Subsonic Test for Ingesting Non-Uniform Gradient Airflow and Boundary Layer Experiment (STINGABLE) Completed 4 Propulsion Systems Armstrong Flight Research Center 2025-12-18 —
Design of a Secondary Volatile Release & Storage ISRU System Completed 4 Resource Acquisition, Isolation, and Preparation Kennedy Space Center 2025-12-18 —
Development of Corrosion-Resistant Molecular Sieve Inclusion Nanocomposite (MoSIN) Membranes to Recover Water from Urine through Osmotic Processes Completed 3 Water Recovery and Management Arizona State University-Tempe 2025-12-18 —
High-current Hollow Cathode Development Completed 4 Electric Space Propulsion Glenn Research Center 2025-12-18 —
Adaptive Sampling to Enable Autonomous Systems Analysis and Design Completed 1 Science, Engineering, and Mission Data Life Cycle Langley Research Center 2025-12-18 —
ADEPT-Spider weave thermal testing (Spiderweave-ACO) Completed 4 Hypersonic Decelerators Bally Ribbon Mills 2025-12-18 —
Deep Machine-Learning Methodology for Space Exploration Medical Diagnosis, Year 2 (DML MD) Completed 4 Medical Diagnosis and Prognosis Johnson Space Center 2025-12-18 —
Advanced Space Technology Roadmapping Architecture (ASTRA) Completed 4 Model-Based Systems Engineering Massachusetts Institute of Technology 2025-12-18 —
Photophoretic propulsion enabling mesosphere exploration Active — — Clinical Practices of the University of Pennsylvania 2025-12-18 —
Particle Impact Simulation and Ignition Prediction Completed 6 Integrated Systems and Ancillary Technologies Johnson Space Center 2025-12-18 —
Gravity Poppers: Hopping Probes for the Interior Mapping of Small Solar System Bodies Active — — Jet Propulsion Laboratory 2025-12-18 —
Hydrogen Peroxide / Kerosene Engine Development Completed 6 Earth Storable Propellants Dynetics, Inc. 2025-12-18 —
Power Beaming for Long Life Venus Surface Missions Completed 2 Distribution and Transmission Jet Propulsion Laboratory 2025-12-18 —
Ultrafast Laser Material Processing: Welding, Drilling and Waveguide Inscription, Year 1 Completed 1 Lasers Goddard Space Flight Center 2025-12-18 —
Lunar-Polar Propellant Mining Outpost: Affordable Exploration and Industrialization (LPMO) Completed 3 Resource Acquisition, Isolation, and Preparation Trans Astronautica Corporation 2025-12-18 —
In situ Recovery of Oxygen and High Purity, Single Element Metals from Regolith using Task Specific Ionic Liquid Facilitated Electrochemical Solvent Extraction Completed 3 Resource Processing for Production of Mission Consumables University of Colorado Boulder 2025-12-18 —
Plant Leaching for Nutrient Recovery in Closed Loop Systems, Year 1 Completed 8 — Kennedy Space Center 2025-12-18 —
Scalable Metaverse Enabled Digital Twin Platform Year 1 of 3 Completed 4 Model-Based Systems Engineering Johnson Space Center 2025-12-18 —
Flame Propagation in a Dump Combustor with Shear Layer Excitation Completed 3 Other Propulsion Systems Purdue University-Main Campus 2025-12-18 —
Flow Boiling and Condensation in Microgravity Completed 3 Thermal Control Analysis Purdue University-Main Campus 2025-12-18 —
First Demonstration of Pulsar Positioning System, Year 2 (PPS) Completed 6 — Jet Propulsion Laboratory 2025-12-18 —
Electrostatic Droplet Dispensing System Completed 5 — Glenn Research Center 2025-12-18 —
Electrochemical Detection of Biological Catalysts as Signatures of Life Completed 4 — Ames Research Center 2025-12-18 —
Large, High-Efficiency Sieves for High-Resolution, Fast-Cadence Solar Imaging Completed 4 Optical Components Goddard Space Flight Center 2025-12-18 —
Broadband Silicon Dielectric Mirrors for Infrared Astronomy Canceled 4 — Goddard Space Flight Center 2025-12-18 —
Prototyping Tensegrity Landers for Ultra-Low Cost Secondary Payloads on Unknown Terrain, Year 1 Completed 4 — Jet Propulsion Laboratory 2025-12-18 —
Evolvable Habitation Architectures for Long-duration Human Exploration Systems Completed 3 Habitation Systems Massachusetts Institute of Technology 2025-12-18 —
Extreme Solar Sailing for Breakthrough Space Exploration Completed 3 Propulsion Systems University of Southern California 2025-12-18 —
A Novel Receiver for Coherent Communication Completed 3 Atmospheric Mitigation Goddard Space Flight Center 2025-12-18 —
A Holistic Bayesian Framework for Intelligent Calibration of Constellations of Sensors Completed 3 Architecture and Design of Autonomous Systems Rutgers University-New Brunswick 2025-12-18 —
Store-Carry-and-Forward Research Completed 3 — Glenn Research Center 2025-12-18 —
Physical Processes in High Current Hollow Cathodes Completed 3 Electrostatic Propulsion University of Michigan-Ann Arbor 2025-12-18 —
Integrated computational materials modelling framework for investigating the process-structure-property linkage of the lunar metal welding with internal defects Active — Digital Transformation Technologies for Manufacturing The University of Texas at Dallas 2025-12-18 —
← Previous Page 155 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.