Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 3 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
TrajGPT: Beyond Low Earth Orbit Trajectory Generation via Machine Learning Active — Trajectory Design and Analysis Johnson Space Center 2026-10-07 —
Urine Stabilization and Toilet Improvement Active — Environmental Control and Life Support Systems and Habitation Systems Marshall Space Flight Center 2026-10-07 —
VAULT: Volatile Autonomous Ultrawide-Band Lunar Tomographer Active — Destination Resource Exploration Ames Research Center 2026-10-07 —
Water vapor Infrared Sunlight Sounder with Photonic integrated circuits (WISSP) Active — Remote Sensing Instruments and Sensors Langley Research Center 2026-10-07 —
Wayfinding and Infrastructure Routing Experiment (WIRE) Active — Surface Construction and Assembly Marshall Space Flight Center 2026-10-07 —
Weather-driven Hazard Assessment of Lunar Electrodynamics (WHALE) Active — Software, Modeling, Simulation, and Information Processing Goddard Space Flight Center 2026-10-07 —
Celestial Reference Frames Canceled 5 Revolutionary PNT Technologies — 2026-10-07 —
Pulsar Timing with NICER Canceled 5 GN&C — 2026-10-07 —
Portable Open-Loop Receiver (POLR) Canceled 5 Network-Provided Position, Navigation, and Timing — 2026-10-07 —
Optical Array Processing Canceled 5 Communications, Navigation, and Orbital Debris Tracking and Characterization Systems Goddard Space Flight Center 2026-10-07 —
High-Rate Uplink Laser Transmitter Canceled 5 Optical Communications — 2026-10-07 —
Near Sun Operational Ground Terminal Canceled 5 Communications, Navigation, and Orbital Debris Tracking and Characterization Systems — 2026-10-07 —
Machine Learning for Cloud Forecasting Canceled 5 — — 2026-10-07 —
Free Space Optical Comm (FSOC) Canceled 6 Optical Communications — 2026-10-07 —
Optical Comm Engineering Core Canceled 8 Optical Communications — 2026-10-07 —
Lunar Coherent Optical Modem (LCOM) Canceled 5 Optical Communications — 2026-10-07 —
Atmospheric Optical Channel Monitoring (Optimetrics) (AOCM) Canceled 6 Optical Communications — 2026-10-07 —
X-ray Pulsar Navigation (XNAV) Canceled 6 Network-Provided Position, Navigation, and Timing — 2026-10-07 —
Delay/Disruption Tolerant Networking (DTN) Active 7 Disruption Tolerant Networking Johnson Space Center 2026-10-07 Low
Advanced Guidance & Navigation Systems (AGNS) Active — GN&C Johnson Space Center 2026-09-16 —
Chemical Mechanical Planarization Technology Enabling for Astrophysics Missions Completed 2 Detectors and Focal Planes Goddard Space Flight Center 2018-10-10 —
High Bandwidth, Large Dynamic-Range Sensor for Controllable Optics, Phase I Completed — Radiation-Hardened Extreme-Environment Components and Implementations Goddard Space Flight Center 2018-10-10 —
Propellant Handler’s Ensemble, aka Self-Contained Atmospheric Protective Ensemble (SCAPE), Ventilator Improvement Study (PHE) Completed 9 Test, Operations, and Systems Safety Kennedy Space Center 2018-10-10 —
Advanced Radiative Emitters for Radioisotope Thermophotovoltaic Power Systems, Phase I Completed — Electrochemical Storage: Fuel Cells Glenn Research Center 2018-10-10 —
A Wireless Communications Platform for Implantable Microinstruments, Phase I Completed — Radiation-Hardened Extreme-Environment Components and Implementations Marshall Space Flight Center 2018-10-10 —
Deflection Channel Radiation Shielding Completed 1 Food Production, Processing, and Preservation Langley Research Center 2018-10-10 —
Low Thermal Loss Cryogenic Pump, Phase II Completed — Measurement and Control Kennedy Space Center 2018-10-10 —
Autonomous Cryogenic Propellent Depot Design, Phase I Completed — Food Production, Processing, and Preservation Marshall Space Flight Center 2018-10-10 —
An Airborne VNIR and SWIR Imaging Spectrometer, Phase I Completed — Food Production, Processing, and Preservation Goddard Space Flight Center 2018-10-10 —
Laser Source for LiDAR Instrument (GSFC IRAD) Completed 2 Lasers Goddard Space Flight Center 2018-10-10 —
Initial Development Work for the Cloud-Aerosol Multi-Angle Lidar (CAMAL) Completed — Lasers NASA Headquarters 2018-10-10 —
High-Frequency, Low-Noise Nitride-Based Power Transistors Grown on Bulk III-N, Phase II Completed — Food Production, Processing, and Preservation Glenn Research Center 2018-10-10 —
An Airborne VNIR and SWIR Imaging Spectrometer, Phase II Completed — Food Production, Processing, and Preservation Goddard Space Flight Center 2018-10-10 —
Design and Manufacture of Lightweight Composite Fan Case, Phase II Completed — Food Production, Processing, and Preservation Glenn Research Center 2018-10-10 —
Software Infrastructure to Enable Modeling & Simulation as a Service (M&SaaS) (M&Saas) Completed 6 Public Cloud Supercomputers NASA Headquarters 2018-10-10 —
Implantable, space-worthy, batteryless biotelemetric monitor for animal studies, Phase I Completed — Food Production, Processing, and Preservation Ames Research Center 2018-10-10 —
Affordable High Performance Electromagnetically Clean Solar Arrays, Phase I Completed — Photovoltaic Electrical Power Glenn Research Center 2018-10-10 —
Multicamera High Dynamic Range High-Speed Video of Rocket Engine Tests and Launches Completed 5 V&V of Ground, Test, and Surface Systems Stennis Space Center 2018-10-10 —
CubeSat Modular Deployable Solar Arrays (CMDSA) Completed 5 Deployables, Docking, and Interfaces Wallops Flight Facility 2018-10-10 —
Photon-noise limited kinetic inductance polarimeter and detector arrays Completed — Detectors and Focal Planes — 2018-10-10 —
Micro ElectroMechanical Systems Optical Beam Steerers, Phase I Completed — Food Production, Processing, and Preservation Goddard Space Flight Center 2018-10-10 —
A High Turn-Down Ratio, Low Emissions Combustor for Gas Turbine Engines, Phase I Completed — Radiation-Hardened Extreme-Environment Components and Implementations Glenn Research Center 2018-10-10 —
Vibration Energy Harvesting for SHM Sensors, Phase I Completed — Materials for Electrical Power Generation, Energy Storage, Power Distribution, and Electrical Machines Langley Research Center 2018-10-10 —
Multiscale GasKinetics/Particle (MGP) Simulation for Rocket Plume/Lunar Dust Interactions, Phase I Completed — Integrated Modeling and Simulation for EDL Kennedy Space Center 2018-10-10 —
High Capacity Nano-Composite Cathodes for Human-Rated Lithium-Ion Batteries, Phase I Completed — Electrochemical Storage: Batteries Glenn Research Center 2018-10-10 —
A Graded Density SiC Foam for Lightweight Optics, Phase I Completed — Food Production, Processing, and Preservation Jet Propulsion Laboratory 2018-10-10 —
Comprehensive Uncertainty Estimation for CFD, Phase I Completed — Food Production, Processing, and Preservation Langley Research Center 2018-10-10 —
Using Zero-Emission Aerial Vehicles in Support of ACE Completed 5 Flight and Ground Testing Methodologies NASA Headquarters 2018-10-10 —
Micromachined Energy Discriminator, Phase I Completed — Radiation-Hardened Extreme-Environment Components and Implementations Goddard Space Flight Center 2018-10-10 —
Nanostructured MnO2-Based Cathodes for Li-ion Polymer Batteries, Phase II Completed — Food Production, Processing, and Preservation Johnson Space Center 2018-10-10 —
← Previous Page 3 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.