Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 87 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
Digital Flow Diagnostics System for Complex Flows, Phase I Completed — Measurement and Control Langley Research Center 2025-01-27 —
SELENE - Self-Forming Extensible Lunar EVA Network, Phase II Completed — Information Assurance Johnson Space Center 2025-01-27 —
Improved Laser performance through Planar Waveguide Technology Development Completed 2 Lasers Goddard Space Flight Center 2025-01-27 —
A High Performance Cathode Heater for Hall Thrusters, Phase II Completed — Thermal Conditioning for Sensors, Instruments, Samples, and High-Efficiency Electric Motors Jet Propulsion Laboratory 2025-01-27 —
High-Fidelity Lunar Dust Simulant, Phase I Completed — Particulate Contamination Prevention and Mitigation Glenn Research Center 2025-01-27 —
Decision Support Tool and Simulation Testbed for Airborne Spacing and Merging in Super Dense Operations, Phase I Completed — Traffic Management Concepts Langley Research Center 2025-01-27 —
Finite Element based Fracture Mechanics using Multidisciplinary Approach, Phase I Completed — Radiation-Hardened Extreme-Environment Components and Implementations Armstrong Flight Research Center 2025-01-27 —
High-Power, Single-Frequency UV Laser Transmitter, Phase II Completed — Food Production, Processing, and Preservation Goddard Space Flight Center 2025-01-27 —
Integrated Cognitive Assessment: Combining Measurement, System, and Mission, Phase II Completed — Cognitive Networking Johnson Space Center 2025-01-27 —
Remote Data Exploration with the Interactive Data Language, Phase II Completed — — Goddard Space Flight Center 2025-01-27 —
Battery separator membrane having a selectable thermal shut-down temperature, Phase I Completed — Electrochemical Storage: Batteries Johnson Space Center 2025-01-27 —
AggieSat: Autonomous Rendezvous and Docking Technology Demonstrator, Phase I Completed 7 Attitude Estimation Sensors Johnson Space Center 2025-01-27 —
Methods for Assessing the Stability and Robustness of Distributed ATM Systems, Phase II Completed — Food Production, Processing, and Preservation Ames Research Center 2025-01-27 —
Actively Cooled Silicon Lightweight Mirrors for Far Infrared and Submillimeter Optical Systems, Phase II Completed — Mirror Systems Marshall Space Flight Center 2025-01-27 —
Miniature Non-Intrusive Multi-Parameter Oronasal Respiratory Health Monitor, Phase I Completed — Contactless and Wearable Human Health and Performance Monitoring Johnson Space Center 2025-01-27 —
Integration of DST's for non-conflicting end-to-end flight scheduling, Phase II Completed — Decompression Sickness Mitigation Ames Research Center 2025-01-27 —
Physics-Based Pneumatic Hammer Instability Model, Phase II Completed — Computational Materials Marshall Space Flight Center 2025-01-27 —
Gradient Interphase, 3-D Fiber Architecture CMC's, Phase I Completed — Thermal Protection Materials Marshall Space Flight Center 2025-01-27 —
A 3-D Miniature LIDAR System for Mobile Robot Navigation, Phase II Completed — Sensing for Robotic Systems Johnson Space Center 2025-01-27 —
Catalyst for Selective Oxidation of Ammonia to Nitrogen and Water, Phase I Completed — Food Production, Processing, and Preservation Ames Research Center 2025-01-27 —
Virtual Telescope Alignment System Completed 5 Observatories Goddard Space Flight Center 2025-01-27 —
Biodegradable Nanocomposites for Advanced Packaging, Phase I Completed — Food Production, Processing, and Preservation Johnson Space Center 2025-01-27 —
Micromachined Piezoelectric Actuators for Cryogenic Adaptive Optics, Phase I Completed — Mirror Systems Jet Propulsion Laboratory 2025-01-27 —
FGM HfC/Sic Composites for RlV Leading Edge Applications, Phase I Completed — Food Production, Processing, and Preservation Langley Research Center 2025-01-27 —
Development of Formation Flying Sensors Completed 4 Distributed Aperture — 2025-01-27 —
Integrated PEMFC Flow Field Design Concept for Gravity Independent Passive Water Removal, Phase II Completed — Distribution and Transmission Johnson Space Center 2025-01-27 —
Development of a Multipurpose Extruder/Press Food Processing System, Phase I Completed — Test, Tools, and Methods Johnson Space Center 2025-01-27 —
A Magnetic Refrigerator for Cooling at 2 K, Phase I Completed — Thermal Conditioning for Sensors, Instruments, Samples, and High-Efficiency Electric Motors Ames Research Center 2025-01-27 —
InN-Based Quantum Dot Solar Cells, Phase II Completed — Photovoltaic Electrical Power Glenn Research Center 2025-01-27 —
High Resolving Power Volume Diffractive Gratings for 400-2700 nm Spectral Range, Phase I Completed — Lasers Goddard Space Flight Center 2025-01-27 —
Reflight of the Stratospheric TeraHertz Observatory: STO-2 Completed — Microwave, Millimeter Waves, and Submillimeter Waves — 2025-01-27 —
Advanced On Board Inert Gas Generation System (OBBIGS), Phase II Completed — Engine Icing Langley Research Center 2025-01-27 —
Novel Non-Intrusive Vibration Monitoring System for Turbopumps, Phase I Completed — Fault Diagnosis and Prognosis Marshall Space Flight Center 2025-01-27 —
High Thermal Conductivity Functionally Graded Heat Sinks for High Power Packaging, Phase I Completed — Materials for Electrical Power Generation, Energy Storage, Power Distribution, and Electrical Machines Glenn Research Center 2025-01-27 —
High Volume, Low-Cost Production Process for High-grade Silicon Carbide Optics, Phase II Completed — Electronics and Optics Manufacturing Processes Goddard Space Flight Center 2025-01-27 —
Compact, Wavelength Stabilized Seed Source for Multi-Wavelength Lidar Applications, Phase II Completed — Lasers Langley Research Center 2025-01-27 —
Optical Navigation System, Phase II Completed — Navigation Sensors Goddard Space Flight Center 2025-01-27 —
Ultra High-Density Deformable Mirror for Large Telescopes, Phase II Completed — Food Production, Processing, and Preservation Jet Propulsion Laboratory 2025-01-27 —
Energy Efficient Cryogenic Transfer Line with Magnetic Suspension, Phase I Completed — In-Space Propellant Storage and Use Kennedy Space Center 2025-01-27 —
A New Methodology for Calculating Launch Vehicle Ascent Loads, Phase I Completed — Launch Vehicle Propellant Marshall Space Flight Center 2025-01-27 —
Biomarker Detection using PS2-Thioaptamers, Phase I Completed — Launch Vehicle Propellant — 2025-01-27 —
Propulsion Design with Freeform Fabrication, Phase I Completed — Solar Thermal Propulsion Glenn Research Center 2025-01-27 —
Silicon Germanium Alloy Photovoltaics for 1.06 Micron Wireless Power Transmission, Phase I Completed — Lasers Marshall Space Flight Center 2025-01-27 —
Lab-on-a-chip astrobiology analyzer, Phase I Completed — Sample Acquisition and Handling Ames Research Center 2025-01-27 —
High-Conductance Thermal Interfaces Based on Carbon Nanotubes, Phase II Completed — Heat Rejection and Storage Marshall Space Flight Center 2025-01-27 —
Magneto-Thermography and Hybrid Methods for Composite Life Management, Phase I Completed — Electromagnetic Wave–Based Sensors Langley Research Center 2025-01-27 —
A Transmission Ultrasound Camera for Imaging of Extravascular Gas In Vivo, Phase II Completed — Food Production, Processing, and Preservation Johnson Space Center 2025-01-27 —
Extreme Environment High Temperature Communication Systems, Phase I Completed — Extreme Environments Related to Critical System Health Management Jet Propulsion Laboratory 2025-01-27 —
Efficient High Power 2 micron Tm3+-Doped Fiber Laser, Phase II Completed — Lasers Langley Research Center 2025-01-27 —
Revolutionary Performance For Ultra Low Reynolds Number Vehicles, Phase II Completed — Turbine-Based Combined Cycle Armstrong Flight Research Center 2025-01-27 —
← Previous Page 87 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.