Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 97 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
Multiuser Collaboration for Planetary Mobility and Robotics, Phase I Completed — Static Energy Conversion Jet Propulsion Laboratory 2025-01-27 —
Laser-Induced Emissions Sensor for Soot Mass in Rocket Plumes, Phase I Completed — Propulsion Flowpath and Interactions Stennis Space Center 2025-01-27 —
NavCube: A fully realized modernized GPS receiver Completed 3 Microwave, Millimeter Waves, and Submillimeter Waves Goddard Space Flight Center 2025-01-27 —
Advanced Electroactive Single Crystal and Polymer Actuators for Passive Optics, Phase II Completed — Mechanism-Life-Extension Systems Langley Research Center 2025-01-27 —
Milliwatt Radioisotope Stirling Convertor, Phase II Completed — Electrical Power Conversion and Regulation Glenn Research Center 2025-01-27 —
Course of Action Simulation, Phase I Completed — Radiation-Hardened Extreme-Environment Components and Implementations Ames Research Center 2025-01-27 —
Advanced Nongray Radiation Module in the LOCI Framework for Combustion CFD, Phase II Completed — Integrated Modeling and Simulation for EDL Marshall Space Flight Center 2025-01-27 —
Laser Materials for Remote Sensing of Ozone, Phase II Completed — — Langley Research Center 2025-01-27 —
Fuel Cell/Li-ion Battery Hybrid Power System for Space Suits, Phase I Completed — Electrochemical Storage: Fuel Cells Johnson Space Center 2025-01-27 —
DEVELOPMENT OF A LOW POWER, LOW MASS, SMALL AND EASILY DEPLOYABLE PLANETARY BROADBAND MICRO-SEISMOMETER Completed 2 Microwave, Millimeter Waves, and Submillimeter Waves — 2025-01-27 —
Ultra-Low Noise Quad Photoreceiver for Space Based Laser Interferometric Gravity Wave Detection, Phase I Completed — Detectors and Focal Planes Goddard Space Flight Center 2025-01-27 —
Ultralightweight, Regeneratively Cooled Combustion Chamber for Mars Ascent Vehicles, Phase I Completed — Sustainable Manufacturing Jet Propulsion Laboratory 2025-01-27 —
Atomic Layer Deposition to Enable the Production, Optimization and Protection of Spaceflight Hardware Project (ALD) Completed 4 Special Materials Goddard Space Flight Center 2025-01-27 —
Ground Enterprise Management System, Phase II Completed — Team Preparedness and Training Ames Research Center 2025-01-27 —
Detecting Fossilized Microscopic Life Forms on Mars with Dual-Energy CT, Phase I Completed — Decompression Sickness Mitigation Jet Propulsion Laboratory 2025-01-27 —
Structural-Acoustic Simulations in Early Airframe Design, Phase I Completed — Aeroelasticity Langley Research Center 2025-01-27 —
Ad-hoc Content-based Queries and Data Analysis for Virtual Observatories, Phase II Completed — High-Performance Data Analytics Platform Goddard Space Flight Center 2025-01-27 —
Cryogenic Vibration Damping Mechanisms for Space Telescopes and Interferometers, Phase I Completed — Thermal Conditioning for Sensors, Instruments, Samples, and High-Efficiency Electric Motors Jet Propulsion Laboratory 2025-01-27 —
Intelligent Agents for Improved Ground-Test Operations, Phase I Completed — Collaboration and Interaction Stennis Space Center 2025-01-27 —
Trajectory and Performance Models for Earth and Planetary Balloons, Phase I Completed — Integrated Modeling and Simulation for EDL Goddard Space Flight Center 2025-01-27 —
Novel Magnetically-Tuned TES For Imaging X-ray Spectroscopy Project Completed 2 Detectors and Focal Planes Goddard Space Flight Center 2025-01-27 —
Ejector Pump Flow Control for Increased Compressor Operability, Phase II Completed — Food Production, Processing, and Preservation Glenn Research Center 2025-01-27 —
Fatigue Countermeasures: A Meta-Analytic Integration, Phase I Completed — Decompression Sickness Mitigation Ames Research Center 2025-01-27 —
Development of Tensor Superconducting Gravity Gradiometer for Planetary Missions Completed 3 Detectors and Focal Planes — 2025-01-27 —
A Novel Cyclic Catalytic Reformer for Hydrocarbon Fuels, Phase I Completed — Alternative Low-Carbon Jet Fuel Glenn Research Center 2025-01-27 —
High-Efficiency, Low-Temperature Regenerators for Cryocoolers, Phase I Completed — Thermal Conditioning for Sensors, Instruments, Samples, and High-Efficiency Electric Motors Ames Research Center 2025-01-27 —
Efficient high power 2 micron Tm3+-Doped Fiber Laser, Phase I Completed — Lasers Langley Research Center 2025-01-27 —
Radiation-Hardened Silicon Integrated Low-Loss Nano-Photonic Switches for Array LIDARs, Phase I Completed — Lasers Goddard Space Flight Center 2025-01-27 —
High-Performance Warm-Gas Thrusters for Micro/Nanosatellites, Phase I Completed — Warm Gas Jet Propulsion Laboratory 2025-01-27 —
Multi-Physics Computational Modeling Tool for Materials Damage Assessment, Phase I Completed — Integrated Modeling and Simulation for EDL Langley Research Center 2025-01-27 —
Efficient, Long-Life Biocidal Condenser, Phase II Completed — Coatings Johnson Space Center 2025-01-27 —
A Near-Infrared Photon Counting Camera for High Sensitivity Astronomical Observation, Phase I Completed — Detectors and Focal Planes Goddard Space Flight Center 2025-01-27 —
High Energy, Low Temperature Gelled Bi-Propellant Formulation for Long-Duration In-Space Propulsion, Phase II Completed — Gels Marshall Space Flight Center 2025-01-27 —
Embossing of Aluminum LIGA Heat Exchangers and Lead Micro Regenerators, Phase I Completed — Electrothermal Propulsion Goddard Space Flight Center 2025-01-27 —
Methane Liquid Level Sensor, Phase I Completed — Cryogenic Propulsion Marshall Space Flight Center 2025-01-27 —
A Non-Volatile SRAM For Spaceborne Applications Using a Novel Ferroelectric Non-Linear Dielectric, Phase I Completed — Radiation-Hardened Extreme-Environment Components and Implementations Marshall Space Flight Center 2025-01-27 —
VOST Flow-Control Valve, Phase I Completed — Integrated Systems and Ancillary Technologies Johnson Space Center 2025-01-27 —
Automated On-Board Diagnostics for Copper and Fiber Aircraft Wiring, Phase I Completed — Automated Exascale Software Development Toolset Armstrong Flight Research Center 2025-01-27 —
Cryogenic Advanced Loop Heat Pipe in Temperature Range of 20-30K, Phase II Completed — Thermal Conditioning for Sensors, Instruments, Samples, and High-Efficiency Electric Motors Goddard Space Flight Center 2025-01-27 —
X-Band to W-Band Doppler Radar Using Reconfigurable RF T/R MMIC Series, Phase I Completed — Measurement and Control Jet Propulsion Laboratory 2025-01-27 —
Time-Domain Nonlinear Characterization of Acoustic Liner Response, Phase II Completed — Food Production, Processing, and Preservation Langley Research Center 2025-01-27 —
Advanced Cathode Electrolyzer (ACE), Phase I Completed — Resource Processing for Production of Mission Consumables Glenn Research Center 2025-01-27 —
Development of a Tethered Formation Flight Testbed for ISS, Phase II Completed — Logistics Management Goddard Space Flight Center 2025-01-27 —
Optimized Cellular Core for Rotorcraft, Phase II Completed — Lightweight Structural Materials Glenn Research Center 2025-01-27 —
Portable Non-invasive Sensing Array for Cardiophysiological Monitoring, Phase I Completed — Reliability and Sustainment Johnson Space Center 2025-01-27 —
Real Time Control Software for Electromagnetic Formation Flight, Phase II Completed — Onboard Maneuvering, Pointing, Stabilization, and Flight Control Algorithms Goddard Space Flight Center 2025-01-27 —
Development of a Modular Solar Thermal Propulsion Engine, Phase II Completed — Measurement and Control Marshall Space Flight Center 2025-01-27 —
Nanotube Adsorption for the Capture and Re-liquefaction of Hydrogen Biol-Off During Tanker Transfer Operations, Phase I Completed — Thermal Conditioning for Sensors, Instruments, Samples, and High-Efficiency Electric Motors Kennedy Space Center 2025-01-27 —
Si-O-C Aerogels for TPS of Reentry Vehicles, Phase I Completed — Thermal Protection Materials Marshall Space Flight Center 2025-01-27 —
High Power Electro-Optic Modulator for Space-Based Applications, Phase I Completed — Innovative Signal Modulations Goddard Space Flight Center 2025-01-27 —
← Previous Page 97 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.