Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.
What's active and early-stage — where getting involved could matter →
21,172 projects harvested so far — page 114 of 424.
| Title | Status | TRL | Technology area | Lead organization | Last updated | Potential ⓘ |
|---|---|---|---|---|---|---|
| On-Demand Urine Analyzer, Phase I | Completed | — | Atomic and Molecular Species Assessment | Glenn Research Center | 2025-01-27 | — |
| To Ensure the Integrity of the Cryogenic Propellant Depot Tank Within the Expected Radiation and Space Debris Environment, Phase II | Completed | — | In-Space Propellant Storage and Use | Marshall Space Flight Center | 2025-01-27 | — |
| Label-Free, High-Throughput Proteomics Analyzer, Phase II | Completed | — | Food Production, Processing, and Preservation | Johnson Space Center | 2025-01-27 | — |
| Photonic Crystal Fiber-Based High Sensitivity Gas Sensor, Phase I | Completed | — | Destination Resource Exploration | Ames Research Center | 2025-01-27 | — |
| An Ideal Integrating Bolometer Project | Completed | 1 | Detectors and Focal Planes | Goddard Space Flight Center | 2025-01-27 | — |
| Autonomous Collaborative Agents for Onboard Multi-Sensor Re-Targeting, Phase I | Completed | — | Architectures and Infrastructure | Ames Research Center | 2025-01-27 | — |
| Modular, Fault-Tolerant Electronics Supporting Space Exploration, Phase II | Completed | — | High-Performance Processors | Johnson Space Center | 2025-01-27 | — |
| Wavelength Stabilized High Brightness Direct Diode Pumps for Solid State LIDAR Systems at Eye-Safe Wavelengths, Phase I | Completed | — | Lasers | Langley Research Center | 2025-01-27 | — |
| Superconducting Current Leads for Cryogenic Systems, Phase I | Completed | — | Thermal Conditioning for Sensors, Instruments, Samples, and High-Efficiency Electric Motors | Goddard Space Flight Center | 2025-01-27 | — |
| Multifunctional Metal-Polymer Nanocomposites for Space Applications, Phase I | Completed | — | Special Materials | Langley Research Center | 2025-01-27 | — |
| Identification of Turbomachinery Noise Sources Using Acoustical Holography, Phase I | Completed | — | Aeroacoustics | Glenn Research Center | 2025-01-27 | — |
| A room-temperature all-solid-state 4.7 THz multiplied LO source to enable the heterodyne observation of interstellar neutral oxygen | Completed | — | Microwave, Millimeter Waves, and Submillimeter Waves | — | 2025-01-27 | — |
| Trajectory Design to Benefit Trajectory-Based Surface Operations, Phase I | Completed | — | Traffic Management Concepts | Ames Research Center | 2025-01-27 | — |
| High Temperature Telemetry Transmitter for Venus Exploration, Phase I | Completed | — | Lasers | Jet Propulsion Laboratory | 2025-01-27 | — |
| An all MMIC Replacement for Gunn Diode Oscillators, Phase II | Completed | — | Microwave, Millimeter Waves, and Submillimeter Waves | Goddard Space Flight Center | 2025-01-27 | — |
| Laser Power Transmission Employing a Dual-Use Photovoltaic Concentrator at the Receiving End, Phase I | Completed | — | Photovoltaic Electrical Power | Marshall Space Flight Center | 2025-01-27 | — |
| Improving Binaural Simulation of Structural Acoustics, Phase I | Completed | — | Measurement and Control | Langley Research Center | 2025-01-27 | — |
| Lightweight Ultrahigh Temperature CMC-Encased C/C Structure for Reentry and Hypersonic Applications, Phase II | Completed | — | Hardware-Enabling Secure Avionics | Johnson Space Center | 2025-01-27 | — |
| NIR LIDAR for Hazard Mitigation, Phase II | Completed | — | Lasers | Langley Research Center | 2025-01-27 | — |
| Self-Healing Inflatable, Rigidizable Shelter for the Lunar Environment, Phase II | Completed | — | Surface Construction and Assembly | Marshall Space Flight Center | 2025-01-27 | — |
| Ultraflat Tip-Tilt-Piston MEMS Deformable Mirror, Phase I | Completed | — | Mirror Systems | Jet Propulsion Laboratory | 2025-01-27 | — |
| Counterflow Regolith Heat Exchanger, Phase I | Completed | — | Heat Transport | Kennedy Space Center | 2025-01-27 | — |
| Super Lightweight, Metal Rubber Fabric for Extreme Space Environments, Phase I | Completed | — | Flexible Material Systems | Langley Research Center | 2025-01-27 | — |
| Durable Silver Mirror Coating Via Ion Assisted, Electron Beam Evaporation For Large Aperture Optics, Phase II | Completed | — | Measurement and Control | Jet Propulsion Laboratory | 2025-01-27 | — |
| Integrated Advanced Monopropellant CMC Thruster / Thermal Stand-Off Assembly, Phase I | Completed | — | Electrothermal Propulsion | Marshall Space Flight Center | 2025-01-27 | — |
| Synthetic Receptor-Based Biosensor for Safety and Security Applications, Phase I | Completed | — | Fire Detection, Suppression, and Recovery | Jet Propulsion Laboratory | 2025-01-27 | — |
| Rigidized Deployable Lifting Brake for Atmospheric Entry, Phase I | Completed | — | Resource Acquisition, Isolation, and Preparation | Marshall Space Flight Center | 2025-01-27 | — |
| Oxidatively Stable Flexible Aerogel Composites for Reusable TPS, Phase I | Completed | — | Hardware-Enabling Secure Avionics | Langley Research Center | 2025-01-27 | — |
| Physics-Based Pneumatic Hammer Instability Model, Phase I | Completed | — | Mechanism-Life-Extension Systems | Marshall Space Flight Center | 2025-01-27 | — |
| Low-Loss Packaged Ka-Band (26.5 GHz) MEMS Phase Shifter, Phase I | Completed | — | Radiation-Hardened Extreme-Environment Components and Implementations | Glenn Research Center | 2025-01-27 | — |
| Semantic Summarization for Context Aware Manipulation of Data, Phase I | Completed | — | Intelligent Data Understanding | Ames Research Center | 2025-01-27 | — |
| Airport Configuration Planner with Optimized Weather Forecasts, Phase I | Completed | — | Traffic Management Concepts | Ames Research Center | 2025-01-27 | — |
| Subsurface Coring Sampler System, Phase II | Completed | — | Food Production, Processing, and Preservation | Jet Propulsion Laboratory | 2025-01-27 | — |
| Miniaturized, Low Power Cryogenic Inlet System with Sampling Probes for Titan, Phase II | Completed | — | Sample Acquisition and Handling | Jet Propulsion Laboratory | 2025-01-27 | — |
| Flight Systems Monitor, Phase I | Completed | — | Management and Control | Ames Research Center | 2025-01-27 | — |
| Scaled Model Technology for Flight Research of General Aviation Aircraft, Phase II | Completed | — | Aeroelasticity | Langley Research Center | 2025-01-27 | — |
| X-band Cube Satellite Communication System Demonstration | Completed | 5 | Innovative Signal Modulations | Goddard Space Flight Center | 2025-01-27 | — |
| High-Efficiency, Low-Temperature Regenerators for Cryocoolers, Phase II | Completed | — | Thermal Conditioning for Sensors, Instruments, Samples, and High-Efficiency Electric Motors | Ames Research Center | 2025-01-27 | — |
| Intelligent Medical Systems for Aerospace Emergency Medical Services, Phase I | Completed | — | Food Production, Processing, and Preservation | Ames Research Center | 2025-01-27 | — |
| Finite Element Multidisciplinary Optimization Simulation of Flight Vehicles, Phase I | Completed | — | Aeroelasticity | Armstrong Flight Research Center | 2025-01-27 | — |
| An Advanced Rapid Cycling CO2 and H2O Control System for PLSS, Phase II | Completed | — | Portable Life Support System | Johnson Space Center | 2025-01-27 | — |
| Radiation Hard Multi-Layer Optical Coatings, Phase I | Completed | — | Coatings | Marshall Space Flight Center | 2025-01-27 | — |
| Intelligence-Based Multi-Resolution 3D Visual Modeling, Registration And Obstacle Avoidance Capabilities For Unmanned Vehicles, Phase I | Completed | — | Training | Marshall Space Flight Center | 2025-01-27 | — |
| Lightweight InP Solar Cells for Space Applications, Phase I | Completed | — | Photovoltaic Electrical Power | Glenn Research Center | 2025-01-27 | — |
| Microgravity Compatible Gas-Liquid Separation using Capillary Pressure Gradients, Phase I | Completed | — | Heat Rejection and Storage | Marshall Space Flight Center | 2025-01-27 | — |
| Low Mach Scramjet Cavity Flameholder Stabilization, Phase I | Completed | — | Propulsion Flowpath and Interactions | Langley Research Center | 2025-01-27 | — |
| Light Weight Concepts for Mirrors, Phase II | Completed | — | Food Production, Processing, and Preservation | Goddard Space Flight Center | 2025-01-27 | — |
| A Constraint-Based Geospatial Data Integration System for Wildfire Management, Phase I | Completed | — | Intelligent Data Understanding | Ames Research Center | 2025-01-27 | — |
| Lunar Surface Navigation, Phase I | Completed | — | State Estimation | Glenn Research Center | 2025-01-27 | — |
| Serial In-Line Instrumentation Bus for ROV Engineering Research, Phase I | Completed | — | Informatics and Decision Support Systems | Langley Research Center | 2025-01-27 | — |
lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"
Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.