Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 168 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
Pellet-Beam Propulsion for Breakthrough Space Exploration Completed — Solar Thermal Propulsion University of California-Los Angeles 2025-12-18 —
CREW HaT: Cosmic Radiation Extended Warding using the Halbach Torus Completed 3 Protection Systems University of Wisconsin-Madison 2025-12-18 —
Modulating Retro-Reflectors: High-speed Asymmetric Laser Communications with Low-Fidelity Pointing Requirements (Phase II): Testing and Risk Reduction, Year 2 Completed 6 Innovative Signal Modulations Ames Research Center 2025-12-18 —
Arc Heater Simulator (ARCHeS) Toolkit Completed — Integrated Systems and Ancillary Technologies Ames Research Center 2025-12-18 —
Solid Oxide Fuel Cell Operating on Hydrocarbon Fuel Completed 2 Dynamic Energy Conversion Glenn Research Center 2025-12-18 —
Novel Electrode Material Synthesis and Testing for Molten Regolith Electrolysis Completed 2 In Situ Resource Use Kennedy Space Center 2025-12-18 —
Minimum-Fuel Supersonic Test Trajectories Completed 7 Trajectory Design and Analysis Armstrong Flight Research Center 2025-12-18 —
Vastly Improved Search for Interstellar Asteroids, Year 1 Completed — Optical Components Jet Propulsion Laboratory 2025-12-18 —
Knudsen-Pump-Based Propulsion for Atmospheric and Martian Exploration Completed 3 Nuclear Thermal Propulsion University of Pennsylvania 2025-12-18 —
Space-variant Pancharatnam-Berry Phase Metasurfaces for Segmented Aperture Coronagraphs Completed 4 Optical Components Jet Propulsion Laboratory 2025-12-18 —
Terahertz Heterodyne Spectrometer for In Situ Resource Utilization (THSiRU) Completed 5 Destination Resource Exploration Goddard Space Flight Center 2025-12-18 —
Sweeping Arrays for Film Cooling, Year 2 Completed 4 — Glenn Research Center 2025-12-18 —
SonicSonde: Instrumentation for a Tethered Atmospheric Sensor Suite System, Year 3 Completed 7 Sensors and Instruments Armstrong Flight Research Center 2025-12-18 —
Wing -Tip Vortex Sensor Studies for Formation Flight for Drag Reduction Completed 4 — Armstrong Flight Research Center 2025-12-18 —
Design of Laser Communications Module for Small Satellites Completed 3 Lasers Massachusetts Institute of Technology 2025-12-18 —
Solar System Escape Architecture for Revolutionary Science (SSEARS) Completed 3 Tools and Methodologies for Defining Mission Architectures and Mission Design Jet Propulsion Laboratory 2025-12-18 —
Station Explorer for X-Ray Timing and Navigation Technology (SEXTANT) Completed 7 Revolutionary PNT Technologies Goddard Space Flight Center 2025-12-18 —
Advanced 1.65 Micron Seed Laser for LIDAR Remote Sensing of Methane (Seed Laser) Completed 6 Lasers Freedom Photonics, LLC 2025-12-18 —
Enhanced Ground Control for ISS Robotics Completed 8 Autonomous, Real-Time Command and Control Johnson Space Center 2025-12-18 —
Gaseous Helium Compressor for In-Space and Surface Pneumatic System Resupply Completed 3 Infrastructure Optimization Kennedy Space Center 2025-12-18 —
Evaluation of Optical Distortion Measurement Techniques for Curved Optical Surfaces Completed 4 Test and Qualification Environments Kennedy Space Center 2025-12-18 —
Deep Space Optical Communications (DSOC) Completed 6 Optimetrics Jet Propulsion Laboratory 2025-12-18 —
Demonstration of an Ultra-Low Divergence Angle Gridded Ion Thruster Completed 3 Electromagnetic Propulsion Glenn Research Center 2025-12-18 —
New Control Algorithm Development of Fast Steering Mirrors for Picometer Line-Of-Sight Completed 4 Mirror Systems Goddard Space Flight Center 2025-12-18 —
Scalable Self-Assembling Spacecraft / Satellite Structure System (S6) Completed 4 — Ames Research Center 2025-12-18 —
In-Space Assembly of Perovskite Solar Cells for Very Large Arrays: Space power at terrestrial costs Completed 4 Energy Storage Glenn Research Center 2025-12-18 —
Evaluation of Carbon Composite Overwrap Pressure Vessels Fabricated using Ionic Liquid Epoxies Completed 6 — Marshall Space Flight Center 2025-12-18 —
Revolutionary Deployable Optics Completed 3 Mirror Systems Langley Research Center 2025-12-18 —
Acidic Aerosol Separator Apparatus (ASA) For Venus Aerosol Mass Spectrometer (VAMS), Year 1 Completed 3 In Situ Instruments and Sensors Jet Propulsion Laboratory 2025-12-18 —
Medium-scale deployment and technology maturation of game changing usage of the US high-voltage power transmission grid as a space weather antenna Completed 4 — Goddard Space Flight Center 2025-12-18 —
Assistive Free-Flyers with Gecko-Inspired Adhesive Appendages for Automated Logistics in Space Completed 4 Grappling Technologies Stanford University 2025-12-18 —
Sensitive, selective nanoantenna-based biosensor platform for compact, in-situ exo-life detection and astronaut life support Completed 4 Sample Acquisition and Handling Glenn Research Center 2025-12-18 —
Crystal Shielding for Space Radiation Completed 2 Protection Systems Langley Research Center 2025-12-18 —
A Plasma Aerocapture and Entry System for Manned Missions and Planetary Deep Space Orbiters Completed 3 Field and Particle Detectors MSNW, LLC 2025-12-18 —
Patterned Magnetic Hold-Separate Tech Ph2 Completed — Separation Systems Armstrong Flight Research Center 2025-12-18 —
Novel Material Systems and Methodologies for Transient Thermal Management, Year 1 (RPT & CIF) Completed 3 — Kennedy Space Center 2025-12-18 —
Nuclear Propulsion and Power Non-Nuclear Test Facility: Preliminary Analysis and Feasibility Assessment Project, Year 1 (NP2NTF) Completed 5 Nuclear Thermal Propulsion Stennis Space Center 2025-12-18 —
Rotating Detonation Rocket Engine (RDRE) Nozzle Completed 3 Integrated Systems and Ancillary Technologies Glenn Research Center 2025-12-18 —
A Conceptual Design and Concept of Operations for Intermittent Short-Radius Centrifugation for Artificial Gravity Completed 3 Transformative Health and Performance Concepts University of Colorado Boulder 2025-12-18 —
Life Support Systems: Oxygen Generation and Recovery Active 4 Atmosphere Revitalization Johnson Space Center 2025-12-18 Medium
Swarm Flyby Gravimetry Completed 3 Above-Surface Mobility Johns Hopkins University 2025-12-18 —
Concentrated Solar Regolith Additive Manufacturing Completed 3 Resource Processing for Production of Manufacturing, Construction, and Energy Storage Feedstock Materials Colorado School of Mines 2025-12-18 —
Metal Matrix Composites for On-orbit and On-surface Services in Extreme Space Environment, Year 1 (MOOSE) Completed 3 Lightweight Structural Materials Langley Research Center 2025-12-18 —
Astrophysics and Technical Study of a Solar Neutrino Spacecraft Completed 3 Extreme Environments Related to Critical System Health Management Wichita State University 2025-12-18 —
Lunar Surface VR/ARGOS Trainer Completed 7 Simulation-Based Training and Decision Support Systems Johnson Space Center 2025-12-18 —
Enabling Sustained Presence Using Recyclables (ESPUR) Completed 4 Special Materials Langley Research Center 2025-12-18 —
Deep Network Radiative Transfer: A Revolution in Imaging Spectrometer Atmospheric Correction, Year 1 Completed 3 Detectors and Focal Planes Jet Propulsion Laboratory 2025-12-18 —
Coherent Search of Multi-Detector Gamma-ray Data Completed 2 Science, Engineering, and Mission Data Life Cycle Marshall Space Flight Center 2025-12-18 —
Cavehopping Exploration of Planetary Skylights and Tunnels Completed 3 Below-Surface Mobility Astrobotic Technology, Inc. 2025-12-18 —
High Power Electric Propulsion (HPEP) Completed 5 Electrostatic Propulsion Johnson Space Center 2025-12-18 —
← Previous Page 168 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.