Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 217 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
Fast Response, Fiber-Optic Micromachined Five-Hole Probe for Three-Dimensional Flow Measurements in Harsh Environments Completed 7 Ground and Flight Test Technologies Interdisciplinary Consulting Corporation 2026-01-22 —
Moving Discontinuous Galerkin Solver for Hypersonic Aerothermodynamics Completed 3 Integrated Modeling and Simulation for EDL Corvid Technologies 2026-01-22 —
Contaminant Robust System for Oxygen Production from Lunar and Martian Resources Completed 4 Resource Processing for Production of Mission Consumables Paragon Space Development Corporation 2026-01-22 —
Rechargeable Lithium Metal Cell Completed 4 Electrochemical Storage: Batteries Physical Sciences, Inc. 2026-01-22 —
Rapid Fabrication of High Stability Optical Mirror Blanks Completed 4 Mirror Systems Soter Technology, LLC 2026-01-22 —
Composite Structure Monitoring using Direct Write Sensors Completed 4 Structures and Antennas MesoScribe Technologies, Inc. 2026-01-22 —
An Ultra Low Power Cryo-Refrigerator for Space Completed 4 Thermal Conditioning for Sensors, Instruments, Samples, and High-Efficiency Electric Motors Creare, LLC 2026-01-22 —
Novel Catalysts for Continuous Operation Bosch Reactor Completed 3 Waste Management PH Matter, LLC 2026-01-22 —
Artificial Intelligence for Refining Multi-Aircraft Testbed Environments Completed 3 Materials for Electrical Power Generation, Energy Storage, Power Distribution, and Electrical Machines Aptima, Inc. 2026-01-22 —
Fiber Optic Sensing System for Entry Descent and Landing Completed 4 Instrumentation and Health Monitoring for EDL Sequent Logic, LLC 2026-01-22 —
Multi-Purpose Radio Signal Generation System Completed 6 Attitude Estimation Sensors Emergent Space Technologies, LLC 2026-01-22 —
Neuromorphic Enhanced Cognitive Radio Completed 4 Cognitive Networking Intellisense Systems, Inc. 2026-01-22 —
DiSCO: Dual In-Situ Spectroscopy and Coring Completed 4 Resource Acquisition, Isolation, and Preparation Impossible Sensing, LLC 2026-01-22 —
Deployable Microwave Antennas for CubeSats, NanoSats, and SmallSats Completed 6 Microwave, Millimeter Waves, and Submillimeter Waves Boulder Environmental Sciences and Technology 2026-01-22 —
Ultrasonic Additive Manufacturing for Capillary Heat Transfer Devices and Integrated Heat Exchangers Completed 6 Heat Transport Sheridan Solutions, LLC 2026-01-22 —
Electromagnetic Characterization of Advanced Composites by Voxel-Based Inverse Methods Completed 6 Impact, Damage, and Radiation-Resistant Systems Victor Technologies, LLC 2026-01-22 —
Robust, High Capacity, High Power Lithium Ion Batteries for Space Systems Completed 3 Electrochemical Storage: Batteries Applied Sciences Inc 2026-01-22 —
Wide Operating Temperature Range Ruggedized Ultracapacitor For Deep Space Exploration Completed 4 Advanced Concepts for Energy Storage FastCAP Systems Corporation 2026-01-22 —
An Aero-Acoustic Tool for Terminal Area Operations Completed 5 Pointing, Acquisition, and Tracking Techniques and Technologies Sukra Helitek Inc. 2026-01-22 —
Auralization of Vertical Take-Off and Landing (VTOL) in Urban Environments Completed 6 Aeroacoustics Great Lakes Sound & Vibration, Inc 2026-01-22 —
Monolithic Rare Earth Doped PTR Glass Laser Completed 4 Lasers OptiGrate Corporation 2026-01-22 —
Flexible Automation for Final Assembly of Blanket Arrays Completed 4 Photovoltaic Electrical Power VectorSum, Inc. 2026-01-22 —
Correlation Radiometer ASIC Completed 5 Microwave, Millimeter Waves, and Submillimeter Waves Pacific Microchip Corporation 2026-01-22 —
Electro-Kinetic Ice Gun for Frozen Ice Plume Simulations Completed 6 Microwave, Millimeter Waves, and Submillimeter Waves Connecticut Analytical Corporation 2026-01-22 —
High Efficiency SiC/SiC Composite Heat Exchanger Structures Completed 3 Materials for Electrical Power Generation, Energy Storage, Power Distribution, and Electrical Machines Rolls-Royce High Temperature Composites Inc 2026-01-22 —
Robust optical carbon dioxide isotope analyzer Completed 4 Atmosphere Revitalization Southwest Sciences, Inc. 2026-01-22 —
Flash 3D Planetary Entry, Descent and Landing Sensor Hardening Completed — — Advanced Scientific Concepts, LLC 2026-01-22 —
Compact Integrated DBR Laser Source for Absorption Lidar Instruments Completed 6 Lasers Photodigm, Inc. 2026-01-22 —
Flight Adaptive Blade for Optimum Rotor Response (FABFORR) Completed 5 Aeroacoustics Continuum Dynamics, Inc. 2026-01-22 —
Long Term Ultrastable Laser System at 780 nm for Atomic Clocks Completed 5 Timekeeping and Time Distribution Gener8, Inc. 2026-01-22 —
Enabling Technology for Thermal Protection on HIAD and Other Hypersonic Missions Completed — — S. D. Miller and Associates, PLLC 2026-01-22 —
Employing Ionomer Membrane Technology to Extract Water from Brine Completed 3 Water Recovery and Management Paragon Space Development Corporation 2026-01-22 —
Liquid Interface Diffusion Bonding of FPS Heat Pipes to Core Completed 3 Dynamic Energy Conversion The Peregrine Falcon Corporation 2026-01-22 —
Stacked Programmable Analog and Digital Electronic System (SPADES) Completed 3 Microwave, Millimeter Waves, and Submillimeter Waves Irvine Sensors Corporation 2026-01-22 —
Hybrid Electric Propulsion System for a VTOL/Multirotor Aircraft Completed 7 Electromechanical, Mechanical, and Micromechanical Devices LaunchPoint Technologies, Inc. 2026-01-22 —
Systems and Services for Real-Time Web Access to NPP Data Completed 5 Intelligent Data Understanding Global Science & Technology, Inc. 2026-01-22 —
Laser-Directed CVD 3D Printing System for Refractory Metal Propulsion Hardware, Phase II Completed 5 Manufacturing Processes Ultramet 2026-01-22 —
MeshSLAM: Robust Localization and Large-Scale Mapping in Barren Terrain Completed 6 Onboard Mapping and Data Analysis Mesh Robotics, LLC 2026-01-22 —
Fiber-fed Advanced Pulsed Plasma Thruster (FPPT) Completed 6 Electromagnetic Propulsion CU Aerospace, LLC 2026-01-22 —
Low AC-Loss Superconducting Cable Technology for Electric Aircraft Propulsion Completed 4 Hybrid Electric Systems Hyper Tech Research, Inc. 2026-01-22 —
Industrial Scale Production of Celestial Body Simulants Completed 8 Surface Construction and Assembly Zybek Advanced Products, Inc. 2026-01-22 —
Reliable, Reusable Cryotank Completed 4 Cryogenic Propulsion Gloyer-Taylor Laboratories, LLC 2026-01-22 —
Autonomous Alignment Advancements for Eye-Safe Coherent Lidar Completed 4 Lasers Beyond Photonics, LLC 2026-01-22 —
Analysis and Design Environment for Large Scale System Models and Collaborative Model Development Completed 6 Collaborative Science and Engineering Phoenix Integration 2026-01-22 —
Multifunctional B/C Fiber Composites for Radiation Shielding Completed 6 Lightweight Structural Materials Materials Modification, Inc. 2026-01-22 —
Removing Mid-Spatial Frequency Errors with VIBE Completed 3 Mirror Systems Optimax Systems, Inc. 2026-01-22 —
1.57 Micron High Pulse Energy Single Frequency Fiber Laser Completed 4 Lasers AdValue Photonics, Inc. 2026-01-22 —
Miniaturized Low-Power Piezo Microvalve for NanoSat and CubeSat Propulsion Completed 7 Electrostatic Propulsion Busek Company, Inc. 2026-01-22 —
Developing a Certifiable UAS reliability Assessment Approach Through Algorithmic Redundancy Completed 6 — Systems Technology, Inc. 2026-01-22 —
Reinforcement Learning For Coordination And Control of Swarming Satellites Completed 3 Learning and Adaptation Aster Labs, Inc. 2026-01-22 —
← Previous Page 217 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.