Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 67 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
Ultra Compact, Low Power, NIR, Flash LADAR Receiver, Phase I Completed — Microwave, Millimeter Waves, and Submillimeter Waves Goddard Space Flight Center 2025-01-27 —
Lithium-ion Energy Storage at Very Low Temperatures, Phase I Completed — Electrochemical Storage: Batteries Johnson Space Center 2025-01-27 —
Mars Integrated Propellant Production System, Phase I Completed — Resource Processing for Production of Mission Consumables Kennedy Space Center 2025-01-27 —
Low Noise PAV Ducted Propeller using Automotive Manufacturing, Phase I Completed — Surface Construction and Assembly Langley Research Center 2025-01-27 —
Modular Power System Configured with Standard Product Hybrid DC-DC Converters, Phase I Completed — Electrical Power Conversion and Regulation Johnson Space Center 2025-01-27 —
Switched Emissivity Changes via Electrostatic Attraction, Phase II Completed — Food Production, Processing, and Preservation Goddard Space Flight Center 2025-01-27 —
Development of a 3D Flash LADAR Video Camera for Entry, Decent, and Landing, Phase II Completed — Relative Navigation Sensors Jet Propulsion Laboratory 2025-01-27 —
Low-Stress Iridium Coatings for Thin-Shell X-Ray Telescopes, Phase II Completed — Mirror Systems Goddard Space Flight Center 2025-01-27 —
MOIDSS?- Mobile Online Intelligent Decision Support System, Phase I Completed — Intelligent Data Understanding Stennis Space Center 2025-01-27 —
Reusable In Situ AirCore System for CO2 and Trace Gas Measurements, Phase I Completed — Range Tracking, Surveillance, and Flight Safety Technologies Ames Research Center 2025-01-27 —
Real time, Non-intrusive Detection of Liquid Nitrogen in Liquid Oxygen (LOX) at High Pressure and High Flow, Phase I Completed — Cryogenic Propulsion Stennis Space Center 2025-01-27 —
Flexible T/R Modules for Large-Aperture, Space-Based SAR, Phase I Completed — Flexible Material Systems Jet Propulsion Laboratory 2025-01-27 —
Highly Sensitive Photon Counting Detectors for Deep Space Optical Communications, Phase II Completed — Detectors and Focal Planes Jet Propulsion Laboratory 2025-01-27 —
A Field Reconfigurable Manipulator for Rovers, Phase I Completed — Grappling Technologies Johnson Space Center 2025-01-27 —
Implementation of Extreme STOL Capability in Cruise Efficient Aircraft, Phase I Completed — Thermal Conditioning for Sensors, Instruments, Samples, and High-Efficiency Electric Motors Armstrong Flight Research Center 2025-01-27 —
HIGH ENERGY REPLACEMENT FOR TEFLON PROPELLANT IN PULSED PLASMA THRUSTERS, Phase I Completed — Integrated Systems and Ancillary Technologies Glenn Research Center 2025-01-27 —
Blue Laser for Ice and Melt Pond Lidar Applications Completed — Heating Systems Goddard Space Flight Center 2025-01-27 —
Space-Qualifiable High Reliability Frequency-Stabilized CW Laser Source, Phase I Completed 5 Lasers Goddard Space Flight Center 2025-01-27 —
Onboard Processing and Autonomous Data Acquisition for the DESDynI Mission Completed 5 Exascale Supercomputer File System NASA Headquarters 2025-01-27 —
Membrane Interferometric Carbon Dioxide Sensor, Phase I Completed — Atmosphere Revitalization Johnson Space Center 2025-01-27 —
Nanostructured Catalytic Reactors for Air Purification, Phase I Completed — Remediation Ames Research Center 2025-01-27 —
A Robust Flare Planning Logic for Unmanned Aerial Vehicle Applications, Phase I Completed — Guidance Algorithms Ames Research Center 2025-01-27 —
Environmental Friendly Coatings & Corrosion Prevention for Flight Hardware Completed 5 Coatings Kennedy Space Center 2025-01-27 —
Electrolyzer for NASA Lunar Regenerative Fuel Cells, Phase II Completed — Electrochemical Storage: Fuel Cells Glenn Research Center 2025-01-27 —
Process and Tool Support for Ontology-Aware Life Support System Development and Integration, Phase I Completed — Tools and Methodologies for Performing Systems Analysis Johnson Space Center 2025-01-27 —
Adaptive Filtering for Aeroservoelastic Response Suppression, Phase I Completed — Aeroelasticity Armstrong Flight Research Center 2025-01-27 —
Enabling Technologies for Fabrication of Large Area Flexible Antennas, Phase II Completed — Microwave, Millimeter Waves, and Submillimeter Waves Jet Propulsion Laboratory 2025-01-27 —
Tracking Launch Vehicles in Interference and Jamming, Phase I Completed — Attitude Estimation Sensors Kennedy Space Center 2025-01-27 —
Laser Ablation - Optical Cavity Isotopic Spectrometer (LAOCIS), Phase II Completed — Lasers Ames Research Center 2025-01-27 —
Flight Lossless Data Compression Electronics, Phase II Completed — High-Performance Memories Goddard Space Flight Center 2025-01-27 —
Enhancing the Processing Characteristics of Edible Beans, Phase I Completed — Resource Processing for Production of Mission Consumables Johnson Space Center 2025-01-27 —
High Recovery, Low Fouling Reverse Osmosis Membrane Elements for Space Wastewater Reclamation, Phase I Completed — Water Recovery and Management Johnson Space Center 2025-01-27 —
Integration of Performance Based Operations into ATM and TFM Simulations, Phase I Completed — Traffic Management Concepts Ames Research Center 2025-01-27 —
Virtual Satellite Integration Environment, Phase II Completed — Tools and Methodologies for Performing Systems Analysis Ames Research Center 2025-01-27 —
Light Metal Propellant Hall Thruster, Phase I Completed — Electrostatic Propulsion Jet Propulsion Laboratory 2025-01-27 —
Improved Ionic Liquids as Space Lubricants, Phase I Completed 5 Mechanism-Life-Extension Systems Glenn Research Center 2025-01-27 —
Advanced On Board Inert Gas Generation System (OBBIGS), Phase I Completed — Engine Icing Langley Research Center 2025-01-27 —
High Operating Temperature, Radiation-Hard MIM Thermophotovoltaic Converters, Phase II Completed — Thermal Conditioning for Sensors, Instruments, Samples, and High-Efficiency Electric Motors Glenn Research Center 2025-01-27 —
Self-Assembling Wireless Autonomous Reconfigurable Modules (SWARM), Phase II Completed — Microgravity Construction and Assembly Marshall Space Flight Center 2025-01-27 —
A Physics-Based Starting Model for Gas Turbine Engines, Phase I Completed 2 Airbreathing Pressure Gain Combustion Glenn Research Center 2025-01-27 —
On-Demand Urine Analyzer, Phase II Completed — Thermal Conditioning for Sensors, Instruments, Samples, and High-Efficiency Electric Motors Glenn Research Center 2025-01-27 —
Surface Modification of Exfoliated Graphite Nano-Reinforcements, Phase II Completed — Sample Acquisition and Handling Glenn Research Center 2025-01-27 —
Control of Internal and External Short Circuits in Lithium Ion and Lithium Batteries, Phase I Completed — Electrochemical Storage: Fuel Cells Johnson Space Center 2025-01-27 —
High Temperature Capacitors for Venus Exploration, Phase I Completed — Thermal Conditioning for Sensors, Instruments, Samples, and High-Efficiency Electric Motors Jet Propulsion Laboratory 2025-01-27 —
Reaction Wheel Disturbance Model Extraction Software, Phase I Completed — Robot Navigation and Path Planning Goddard Space Flight Center 2025-01-27 —
Conformal Light Augmented Single Substrate Head-Mounted Display, Phase I Completed — Informatics and Decision Support Systems Johnson Space Center 2025-01-27 —
Nitrous Paraffin Hybrid, Phase I Completed — Hybrids Marshall Space Flight Center 2025-01-27 —
SASSI: Subsystems for Automated Subsurface Sampling Instruments, Phase I Completed — Sample Acquisition and Handling Jet Propulsion Laboratory 2025-01-27 —
Foil Gas Bearing Supported Quiet Fan for Spacecraft Ventilation, Phase I Completed 4 In-Space Propellant Storage and Use Johnson Space Center 2025-01-27 —
Miniaturized, Low Power Cryogenic Inlet System with Sampling Probes for Titan, Phase I Completed — Sample Acquisition and Handling Jet Propulsion Laboratory 2025-01-27 —
← Previous Page 67 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.