Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 122 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
Flight Demonstration of an Integrated Camera and Solid-State Fine Steering System Canceled 4 Mirror Systems Southwest Research Institute - Boulder 2025-06-25 —
Characterizing CubeSat Deployer Dynamics in a Microgravity Environment Canceled 4 Field and Particle Detectors California Polytechnic State University-San Luis Obispo 2025-06-25 —
Terrain Relative Navigation Descent Imager (TRNDI) Testing Canceled 4 Onboard Navigation Algorithms The Charles Stark Draper Laboratory, Inc. 2025-06-25 —
Rocket Flight of a Delta-Doped Charge Coupled Device (CCD) Focal Plane Array for Colorado High-Resolution Echelle Stellar Spectrograph (CHESS) Canceled 4 Detectors and Focal Planes Arizona State University-Tempe 2025-06-25 —
Miniature Altitude Determination System Canceled 4 Attitude Estimation Sensors Jet Propulsion Laboratory 2025-06-25 —
New Mexico Student Groups #3 and #4 for SL-8 Canceled 5 Lasers New Mexico Space Grant Consortium 2025-06-25 —
Real Time Conformational Analysis of Rhodopsin using Plasmon Waveguide Resonance Spectroscopy Testing Canceled 4 Detectors and Focal Planes University of Arizona 2025-06-25 —
Assessing Otolith-Organ Function with Vestibular Evoked Myogenic Potentials (VEMPs) in Parabolic Flight Canceled 4 Medical Diagnosis and Prognosis Johns Hopkins University 2025-06-25 —
Operational Demonstration of the MPS-120 CubeSat High-impulse Adaptable Modular Propulsion System Canceled 4 Electrostatic Propulsion Aerojet Rocketdyne Holdings, Inc. 2025-06-25 —
Demonstration of One-Fault Tolerant Precision Navigation for Autolanding Airless Bodies: Flight Two Canceled 5 Rendezvous, Proximity Operations, and Capture Sensor Processing and Processors Astrobotic Technology, Inc. 2025-06-25 —
Electric-hydrodynamic Control of Two-Phase Heat Transfer in Microgravity Testing Canceled 3 Heat Transport New Jersey Institute of Technology 2025-06-25 —
Sub-System Coupling for Grey Water Purification (VPCAR) (VPCAR) Canceled 7 Water Recovery and Management Kennedy Space Center 2025-06-25 —
Lawrence Livermore Deep Violet Instrument (PTD-R) Completed — Optical Components Lawrence Livermore National Laboratory 2025-06-25 —
Spacecraft Disturbance Isolation and Rejection Platform (SDIRP) Testing Canceled 4 Pointing, Acquisition, and Tracking Techniques and Technologies Jet Propulsion Laboratory 2025-06-25 —
Advanced Hybrid Rocket Motor Propulsion Unit for CubeSats (PUC) Testing Canceled 4 Hybrids The Aerospace Corporation 2025-06-25 —
Saturated Fluid Pistonless Pump Technology Demonstrator Canceled 4 Integrated Systems and Ancillary Technologies University of Colorado Boulder 2025-06-25 —
Picture this SELFI: A Maturation for a Submillimeter Enceladus Life Finder Instrument (SELFI) Completed 4 Detectors and Focal Planes Goddard Space Flight Center 2025-07-03 —
The DEEP Project: DEtecting Extraterrestrial Piezophiles in Ocean World Analogs Completed — Sample Acquisition and Handling — 2025-07-03 —
Global Reference Atmospheric Model (GRAM) Completed 2 Science Modeling Langley Research Center 2025-07-16 —
PReSSiC: Planetary Remote Sensing using SiC detectors Completed — In Situ Resource Use NASA Headquarters 2025-07-16 —
2-µm high-power, high repetition rate pulsed fiber laser for lidar Martian atmospheric CO2 and pressure profiling Completed — Remote Sensing Instruments and Sensors NASA Headquarters 2025-07-16 —
Hybrid AC/DC Magnetometer with Attitude Determination and Control System Active 3 In Situ Instruments and Sensors University of Michigan-Ann Arbor 2025-07-23 High
Measuring optical constants of multilayer materials for current and future hard X-ray space telescopes Completed — Mirror Systems Lawrence Livermore National Laboratory 2025-07-29 —
PARTI Pucks (PARTI) Completed — Innovative Antennas Stone Aerospace, Inc. 2025-08-11 —
Robust, Explainable Autonomy for Scientific Icy Moon Operations Completed — Anomaly Detection California Institute of Technology 2025-08-11 —
Ultra-Violet Detector Innovation for Raman Exploration and CharacTerization (UV-DIRECT) of Ocean Worlds Completed 2 In Situ Instruments and Sensors University of Maryland-College Park 2025-08-11 —
Flexible Ion Sensing Array (FISA) Completed 2 Sensors and Instruments California Institute of Technology 2025-08-11 —
A Miniaturized, Multifunctional, Microscopic Organic/Inorganic Composition Analytical Probe for Planetary in situ Spectroscopy Completed 2 Sensors and Instruments Virginia Polytechnic Institute and State University 2025-08-11 —
ORIGINS: Photothermal Spectroscopy for Planetary Sciences (ORIGINS) Completed 2 Sensors and Instruments University of Central Florida 2025-08-11 —
OptiDrill: The next-generation instrumented drill Completed 4 In Situ Resource Use Honeybee Robotics, Ltd. 2025-08-11 —
CMOS Digital Ground Penetrating Radar with Hardware Embedded Artificial Intelligence for Sub-Surface Exploration Completed — In Situ Instruments and Sensors Jet Propulsion Laboratory 2025-08-11 —
Tunable Mid-Infrared Spectroscopic Imaging Lidar for 4D Volatile Mapping Completed — Sensing and Perception NASA Headquarters 2025-08-11 —
A Robust Electron Source for a Miniaturized Electron Probe for In Situ Elemental Microanalysis Completed — In Situ Instruments and Sensors Goddard Space Flight Center 2025-08-11 —
Enabling multi-platform mission planning and operations simulation environments for adaptive remote sensors Completed 4 Tools and Methodologies for Defining Mission Architectures and Mission Design Ohio State University-Main Campus 2025-08-22 —
4D Tomography Study Completed — Remote Sensing Instruments and Sensors Jet Propulsion Laboratory 2025-08-22 —
A Stable, Non-Cesiated III-Nitride Photocathode for Ultraviolet Astronomy Applications Completed 5 Detectors and Focal Planes — 2025-08-22 —
Flight receivers for orbital remote sensing of buried lunar ice deposits via CoRaLS: the Cosmic Ray Lunar Sounder Completed — Remote Sensing Instruments and Sensors University of Hawaii at Manoa 2025-08-22 —
Tunable Light-guide Image Processing Snapshot Spectrometer (TuLIPSS) for Earth Science Research and Observation Completed 4 Detectors and Focal Planes Rice University 2025-08-22 —
Technology Development for Direct Fabrication of Light-Weight High-Resolution Full-Shell X-Ray Optics Completed 3 Mirror Systems Marshall Space Flight Center 2025-08-22 —
RISE-UP: Ross Ice Shelf and Europa Underwater Probe Completed — Engine Icing — 2025-08-22 —
Phase Measurement System for Gravitational Wave Detection Completed 4 Field and Particle Detectors — 2025-08-22 —
High Energy, Long Cycle Life, and Extreme Temperature Lithium-Sulfur Battery for Venus Missions Completed — Electrochemical Storage: Batteries University of Dayton 2025-08-22 —
Microfluidic Wet Chemistry Laboratory (mWCL) for Assessing Habitability of Ocean Worlds by Analysis of Surface or Plume Samples Completed — Sample Acquisition and Handling — 2025-08-22 —
A miniaturized, low-power magnetometer system for lunar surface observatories Active — Power Management and Distribution University of California-Los Angeles 2025-08-22 —
PLASMA: Pulsed Laser Ablation Sampling and Mass Analysis (PLASMA) Completed — In Situ Instruments and Sensors University of Maryland-College Park 2025-08-22 —
Development of a Hard X-ray Photoelectric Polarimeter Completed — Mirror Systems Goddard Space Flight Center 2025-08-22 —
Biologic and Resource Analog Investigations in Low Light Environments (BRAILLE) Completed — Below-Surface Mobility — 2025-08-22 —
Integrated Digital Earth Analysis System (IDEAS) (IDEAS) Completed 5 Collaborative Science and Engineering Jet Propulsion Laboratory 2025-08-22 —
Computational Reconfigurable Imaging Spectrometer (CRISP) Completed 4 Detectors and Focal Planes Massachusetts Institute of Technology 2025-08-22 —
Modular Dual-band Ku/Ka Antenna Tile with Digital Calibration (K-Tile) Completed 4 Microwave, Millimeter Waves, and Submillimeter Waves NASA Headquarters 2025-08-22 —
← Previous Page 122 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.