Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 139 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
Cold Survivable Distributed Motor Controller (CSDMC) Completed 4 Dexterous Manipulation — 2025-12-02 —
Large-Area, High-Efficiency Diffractive Optics for Solar Imaging Completed 3 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
Microshutters for Far-IR KID Array Characterization Completed 2 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
NextSTEP Hybrid Life Support System (HLSS) Completed 4 Food Production, Processing, and Preservation Sierra Nevada Corporation 2025-12-02 —
Spectroscopic Lidar for Orbital Measurement of Surface Volatiles Completed 3 Lasers Goddard Space Flight Center 2025-12-02 —
Advancing Simultaneous Multi-Angle Hyperspectral Imaging into Thermal Infrared Completed 3 Optical Components Goddard Space Flight Center 2025-12-02 —
Developing a Novel Method to Bond Planetary Regolith to Form Rigid Structures for Space Based Habitats Completed 1 Operations, Health, and Maintenance for Ground and Surface Systems University of Mississippi 2025-12-02 —
Comm and Nav Crosslink Topology Design and Optimization including DSMs Completed 2 Adaptive Network Topology Goddard Space Flight Center 2025-12-02 —
QuEST Laboratory: Advanced Laser Cooling for High-brightness Cs Atom Sources (QuEST) Completed 1 Lasers Goddard Space Flight Center 2025-12-02 —
Deep Throttling Monopropellant Engine Completed 4 Propulsion Systems for Landing Jet Propulsion Laboratory 2025-12-02 —
Towards Scientific Autonomy: Applying Machine Learning to MOMA Science Data Completed 4 Learning and Adaptation Goddard Space Flight Center 2025-12-02 —
Lunar InfraRed (imaging) (LunIR) Completed 6 Destination Resource Exploration Lockheed Martin Space Systems 2025-12-02 —
Space Telecommunications Radio System (STRS) Completed 9 Collaborative Science and Engineering Glenn Research Center 2025-12-02 —
Morpheus Vertical Test Bed (VTB)/Autonomous Landing and Hazard Avoidance Technology (ALHAT) Completed 4 Touchdown Systems Johnson Space Center 2025-12-02 —
Avionics and Software Project (A&S) Canceled 6 Integrated Flight Operations Systems Johnson Space Center 2025-12-02 —
Stress Testing and Hardening the NAS for Safe, Efficient, and Resilient Growth Active 1 Safe All-Vehicle Access University of California-Berkeley 2025-12-02 High
FY18-C1 GRC: Approaches to rapid prototyping of polymer aerogels Completed 3 Lightweight Structural Materials Glenn Research Center 2025-12-02 —
WFF Ground Safety Team Artificial Intelligence Discovery; To Support Higher Volume Launch Tempo Completed 3 Software, Modeling, Simulation, and Information Processing Wallops Flight Facility 2025-12-02 —
Lunar mGNSS Receiver (mGNSS) Active 8 Communications, Navigation, and Orbital Debris Tracking and Characterization Systems Goddard Space Flight Center 2025-12-02 Low
Ion Velocity Spectrometer for Solar Wind Monitor (IVS) Completed 4 Field and Particle Detectors Goddard Space Flight Center 2025-12-02 —
Space Communications and Navigation Testbed (SCaN Testbed) Completed 8 Reliability and Sustainment Glenn Research Center 2025-12-02 —
Long-Path OH Absorption Measurement Completed 3 Lasers Goddard Space Flight Center 2025-12-02 —
Graphene based Photonics Devices for Remote Sensing Applications Project Completed 4 Lasers Goddard Space Flight Center 2025-12-02 —
Microgravity Investigation of Cement Solidification (MICS) Completed 3 Special Materials Pennsylvania State University-Main Campus 2025-12-02 —
Cubesat Compatible Digital Back-End and Low-Noise Front-End for P-band Signals of Opportunity Remote Sensing Completed 4 Electronics Goddard Space Flight Center 2025-12-02 —
Ultra-high Efficiency Noiseless Quantum Sensors for HWO and QIS Completed 3 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
Snow Water Equivalent (SWE) from Space Completed 6 Microwave, Millimeter Waves, and Submillimeter Waves Goddard Space Flight Center 2025-12-02 —
Secure and Safe Assured Autonomy (S2A2) Completed 3 Safe All-Vehicle Access North Carolina A & T State University 2025-12-02 —
Environmentally stable ultraviolet broadband coatings for improved astronomical instrumentation Completed 4 Mirror Systems Goddard Space Flight Center 2025-12-02 —
Digital Array Gas filter Radiometer Passive Methane Sensing Instrument (DAGR) Completed 3 Optical Components Goddard Space Flight Center 2025-12-02 —
Terabyte Infrared Delivery 200Gb/sec Laser Communications System for LEO Direct-to-Earth Missions (TBIRD) Completed 5 Optimetrics NASA Headquarters 2025-12-02 —
Thermally Stable Nanocrystalline Nickel Alloys by Powder Metallurgy Completed 1 Smart Materials Massachusetts Institute of Technology 2025-12-02 —
Development of Improved Combustor Scaling Laws for Dual-Mode Ramjets (AAVP33) Active 3 Ramjet/Scramjet Langley Research Center 2025-12-02 High
Ion Mass Spectrometers for GIRAFF Sounding Rocket Opportunity (IVMS) Completed 5 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
Disruption Tolerant Networking (DTN) Completed 7 Disruption Tolerant Networking Johnson Space Center 2025-12-02 —
High Pressure Transcritical Combustion (HPTC Combustion) Completed 2 Aero Propulsion Glenn Research Center 2025-12-02 —
ILLUMA-T On-Orbit Completed 8 Communications, Navigation, and Orbital Debris Tracking and Characterization Systems Goddard Space Flight Center 2025-12-02 —
An Advanced Optical Navigation Camera for Autonomous Navigation, Guidance, and Control Completed 3 Navigation Sensors Goddard Space Flight Center 2025-12-02 —
Miniaturized UHF radio for direct-to-orbit comm Completed 4 Communications, Navigation, and Orbital Debris Tracking and Characterization Systems Jet Propulsion Laboratory 2025-12-02 —
Common Habitat for Long Duration Transit and Surface Operations Completed 2 Human-System Performance Modeling Johnson Space Center 2025-12-02 —
Development of a modeling technology to use heliophysics data in GEOS (MLT-GEOS) Completed 3 Science Modeling Goddard Space Flight Center 2025-12-02 —
SmallSat Common Electronics Board (SCEB) Completed 5 Other Flight Computing and Avionics Goddard Space Flight Center 2025-12-02 —
MWIR Linear Variable Filter for Planetary Hyperspectral Imaging Completed 4 Detectors and Focal Planes Goddard Space Flight Center 2025-12-02 —
Bigelow Expandable Activity Module Project (BEAM) Completed 9 Materials, Structures, Mechanical Systems, and Manufacturing Johnson Space Center 2025-12-02 —
Improved UHF capabilities using medium gain antennas Completed 3 Communications, Navigation, and Orbital Debris Tracking and Characterization Systems Jet Propulsion Laboratory 2025-12-02 —
Maturation of Thermal InfraRed (IR) and Submillimeter-Wave (Submm) Polarimetry for Ice Cloud Remote Sensing Completed 4 Remote Sensing Instruments and Sensors Goddard Space Flight Center 2025-12-02 —
Lunar Dust level Sensor and Effects on Surfaces (LDES) Active 6 Human Health, Life Support, and Habitation Systems Johnson Space Center 2025-12-02 Medium
Shape Memory Alloy Material Maturation (SMA) Active 2 Surface Mobility Glenn Research Center 2025-12-02 High
Subscale Magnetic Nozzle For Fusion Propulsion Plasma Deflection Completed 2 Solar Thermal Propulsion Marshall Space Flight Center 2025-12-02 —
TM Monitor and Control System (TMACS) Completed 1 Mission Operations and Safety Wallops Flight Facility 2025-12-02 —
← Previous Page 139 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.