Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 173 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
Materials Manufactured from 3D Printed Synthetic Biology Arrays Completed 3 — Ames Research Center 2025-12-18 —
Towards In-Space Additive Manufacturing of Thermosets and Embedded Fibers, Year 1 Completed 4 — Marshall Space Flight Center 2025-12-18 —
Collector Contamination Requirements for Life Detection in Enceladus' Icy Plumes Completed 3 — Ames Research Center 2025-12-18 —
Next Generation of Submm-Wave Spectrometers for Planetary Exploration Completed 3 Detectors and Focal Planes Jet Propulsion Laboratory 2025-12-18 —
Pulsed Lorentz Accelerator Completed 3 Electrostatic Propulsion Marshall Space Flight Center 2025-12-18 —
Hybrid Windows and Mosaic Video: Reducing Complexity of Space Habitable Modules Completed 2 Relative Navigation Sensors Johnson Space Center 2025-12-18 —
Amorphous Background Oriented Schlieren for Flight Test (Study) Completed 4 Detectors and Focal Planes Armstrong Flight Research Center 2025-12-18 —
Ultrasonic Stir Welding Development for Ground Based & In-Situ Fabrication & Repair for In Space Propulsion Systems/Commercial Space Sector Completed 4 Manufacturing Processes Marshall Space Flight Center 2025-12-18 —
A Circuit-Level Radiation Hardened-By-Design Approach for Standard CMOS Completed 3 Radiation-Hardened Extreme-Environment Components and Implementations The University of Tennessee-Knoxville 2025-12-18 —
Quasicontinuum Fracture Modeling and Development of Refractory High Entropy Alloys Completed 2 Thermal Protection Systems University of Minnesota-Twin Cities 2025-12-18 —
Wide-Bandgap III-V Materials for Multijunction Solar Cell Applications Completed 3 Photovoltaic Electrical Power Yale University 2025-12-18 —
Efficient Adaptive Learning for Robotic Operations in Unmodeled Environments with Dynamic Uncertainties Active 2 Small-Body and Microgravity Mobility The University of Texas at Austin 2025-12-18 High
A Compact, High-Precision Optical Payload Enabling Earth-Sized Exoplanet Detection Using Nanosatellites Completed 3 Optical Components Massachusetts Institute of Technology 2025-12-18 —
Phase-change Reconfigurable Optical WavEfront Synthesis System (PROWESS) Completed 4 Remote Sensing Instruments and Sensors Langley Research Center 2025-12-18 —
Meteoroid Impact Detection for Exploration of Asteroids (MIDEA) Completed 3 Destination Resource Exploration Stanford University 2025-12-18 —
Instant Landing Pads for Artemis Lunar Missions Completed 2 Touchdown Systems Masten Space Systems, Inc. 2025-12-18 —
Simulation and Design Environment for In-Space Assembly Metrology Completed — Engineering and Integrity Langley Research Center 2025-12-18 —
Development of a Wide-Spectrum Organic Analysis Instrument, Year 1 Completed 7 — Johnson Space Center 2025-12-18 —
Repair of Mis-drilled Holes by Cold Welding Completed 2 Materials, Structures, Mechanical Systems, and Manufacturing Armstrong Flight Research Center 2025-12-18 —
In-flight Diagnostic Capability for Crew Health by DESI-mass spectrometry Completed 4 Medical Diagnosis and Prognosis Johnson Space Center 2025-12-18 —
Long-Term Rotational Dynamics of Defunct Earth-Orbiting Satellites Completed 3 Orbital Debris Characterization University of Colorado Boulder 2025-12-18 —
High Thrust & High ISP Nuclear Thermal Rocket (NTR) Grooved Ring Fuel Element (GRFE) Completed 3 Nuclear Thermal Propulsion Marshall Space Flight Center 2025-12-18 —
Plasma Rapid Oxidation Technique for Extending Component Tenability (PROTECT) Completed 3 Environment Testing Kennedy Space Center 2025-12-18 —
Kilometer Space Telescope (KST) Completed 3 Structures and Antennas Raytheon Company 2025-12-18 —
Additively Manufactured Hermetically Sealed Isolation Valve Completed 4 Integrated Systems and Ancillary Technologies Goddard Space Flight Center 2025-12-18 —
Flexible Matrix Composites for Passive Flutter Suppression Completed 2 — Armstrong Flight Research Center 2025-12-18 —
Advanced Lightweight Lunar Gantry for Operations (ALLGO) Completed 4 Ground, Test, and Surface Systems Langley Research Center 2025-12-18 —
Field Demonstration of the Ground to Space Laser Calibration: Illumination of NASA's Earth Observing Sensors Completed 2 Lasers Langley Research Center 2025-12-18 —
Green PCB Remediation from Sediment Systems (GPRSS) Completed 4 Natural- and Induced-Environment Characterization and Mitigation Kennedy Space Center 2025-12-18 —
Low Divergence Hall Effect Thruster to Simplify Spacecraft Integration Completed 3 Electrostatic Propulsion Glenn Research Center 2025-12-18 —
High Pressure Plasma-assisted Combustion Completed 4 Hybrids Glenn Research Center 2025-12-18 —
Rapid Electrochemical Detection and Identification of Microbiological and Chemical Contaminants for Manned Spaceflight Completed 5 Air, Water, Microbial, and Acoustic Sensors Johnson Space Center 2025-12-18 —
Surface Decontamination and Biofilm Eradication using Focused Microwave Energy Completed 8 Remediation Johnson Space Center 2025-12-18 —
Fracture Behaviors of Additive Manufactured Alloys Completed 5 — Jet Propulsion Laboratory 2025-12-18 —
Micro Thruster Development with Green Propellant at mN and microN levels Completed 3 — Goddard Space Flight Center 2025-12-18 —
Electrodynamic Dust Shield for Active Dust Mitigation of Thermal Radiators Completed 5 Particulate Contamination Prevention and Mitigation Kennedy Space Center 2025-12-18 —
Bio-Inspired Seal Technology Completed 2 — Glenn Research Center 2025-12-18 —
Development of a highly throttlable, bipropellant (Xe-Kr) Hall thruster and investigations into the newly discovered oscillation modes in magnetically shielded thrusters Completed 3 Electrostatic Propulsion Georgia Institute of Technology-Main Campus 2025-12-18 —
Sutter Ultra: Breakthrough Space Telescope Mission Finds 350X More Asteroids Enabling Asteroid Mining, Human Exploration and Terminal Defense Against Incoming Asteroids (SUTTER) Completed 3 Sensors and Instruments Trans Astra Corporation 2025-12-18 —
Technologies to Enable EDL of Smallsat Science and Exploration Payloads Completed 3 Architecture Design and Analysis University of Colorado Boulder 2025-12-18 —
Real-time Stitched Video for Contextual Path Planning Completed 5 — Johnson Space Center 2025-12-18 —
Pressure Sensitive Paint Applied to Flexible Models Completed 3 Ground and Flight Test Technologies Ames Research Center 2025-12-18 —
GNSS Sub-cm Real-Time Precise Point Positioning, Year 1 (GNSS SCRIPPS*) Completed 3 Software Development, Engineering, and Integrity Jet Propulsion Laboratory 2025-12-18 —
Lunar Environment Dust Testing Technique Development Completed — Particulate Contamination Prevention and Mitigation Johnson Space Center 2025-12-18 —
Autocode from Simulink to Real Time Embedded LINUx on ARM Completed 5 — Armstrong Flight Research Center 2025-12-18 —
Increased Energy Density of Solid Sate Supercapacitors for Habitats Completed — Electrochemical Storage: Batteries Marshall Space Flight Center 2025-12-18 —
Mission Design Tool for Automated Missed-Thrust Design with Multiple Outages Completed 3 Tools and Methodologies for Defining Mission Architectures and Mission Design Purdue University-Main Campus 2025-12-18 —
Lunar Surface Mixed Reality Trainer YEAR 3 Completed 7 Training Johnson Space Center 2025-12-18 —
Realizing Practical Nitinol Locomotion Project Completed 6 Offline Element Processing Stennis Space Center 2025-12-18 —
A Breakthrough Propulsion Architecture for Interstellar Precursor Missions Completed 3 Solar Thermal Propulsion Jet Propulsion Laboratory 2025-12-18 —
← Previous Page 173 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.