Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 95 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
Magnetohydrodynamic-based Laboratories on a Chip for Analysis of Biomolecules, Phase I Completed — Sample Handling Ames Research Center 2025-01-27 —
ZnO UV Detectors, Phase II Completed — Fire Detection, Suppression, and Recovery Goddard Space Flight Center 2025-01-27 —
Reactive In-flight Multisensor Security System (RIMSS), Phase II Completed — Range Tracking, Surveillance, and Flight Safety Technologies Langley Research Center 2025-01-27 —
Expanded Operational Temperature Range for Space Rated Li-Ion Batteries, Phase II Completed — Electrochemical Storage: Fuel Cells Jet Propulsion Laboratory 2025-01-27 —
Avionics Based Runway Incursion Prevention, Phase II Completed — Food Production, Processing, and Preservation Langley Research Center 2025-01-27 —
Very-High Efficiency, High Power Laser Diodes, Phase I Completed — Lasers Goddard Space Flight Center 2025-01-27 —
Magnetometer for Calibrating Jovian Fields, Phase I Completed — Field and Particle Detectors Goddard Space Flight Center 2025-01-27 —
Development of a 3D Flash LADAR Video Camera for Entry, Decent and Landing, Phase I Completed — Relative Navigation Sensors Jet Propulsion Laboratory 2025-01-27 —
Compact Water Electrolyzer for Low-Gravity Environments, Phase I Completed — Warm Gas Johnson Space Center 2025-01-27 —
Nanostructured electrodes for Solar Power Generation, Phase I Completed — Photovoltaic Electrical Power Glenn Research Center 2025-01-27 —
Cost-Effective Powder Metallurgy TiAl-Based Components For Aerospace Use, Phase I Completed — Smart Materials Langley Research Center 2025-01-27 —
Ultra-Lightweight High Efficiency Nanostructured Materials and Coatings for Deep Space Mission Environments, Phase II Completed — In-Space Propellant Storage and Use Glenn Research Center 2025-01-27 —
High Performance Dual Band Photodetector Arrays for MWIR/LWIR Imaging, Phase II Completed — Detectors and Focal Planes Langley Research Center 2025-01-27 —
Data Filtering and Assimilation of Satellite Derived Aerosol Optical Depth, Phase I Completed — Science, Engineering, and Mission Data Life Cycle Langley Research Center 2025-01-27 —
Lunar Sulfur Capture System, Phase I Completed — Resource Acquisition, Isolation, and Preparation Kennedy Space Center 2025-01-27 —
In Situ Manufacturing of Plastics and Composites to Support H&R Exploration, Phase II Completed — Resource Processing for Production of Manufacturing, Construction, and Energy Storage Feedstock Materials Marshall Space Flight Center 2025-01-27 —
Low-Power, Lightweight Cloud Water Content Sensor, Phase II Completed — Public Cloud Supercomputers Goddard Space Flight Center 2025-01-27 —
Retroreflector Array for Test Environments (RATE), Phase I Completed — Test Instruments and Sensors Ames Research Center 2025-01-27 —
New Analysis and Theory of Deployable Folded Structures, Phase I Completed — Deployables, Docking, and Interfaces Langley Research Center 2025-01-27 —
Acoustic Igniter, Phase I Completed — Resource Processing for Production of Mission Consumables Marshall Space Flight Center 2025-01-27 —
Grazing Optical Polishing: a Fast and Efficient Technique for Making Lightweight Sub-Arc-Second X-ray Mirrors Completed — Mirror Systems — 2025-01-27 —
Organized Hole Conducting Polymer/Nanoparticle Composite Solar Cell Fiber, Phase I Completed — Photovoltaic Electrical Power Glenn Research Center 2025-01-27 —
Numerical Simulation of Rocket Exhaust Interaction with Lunar Soil, Phase I Completed — Integrated Modeling and Simulation for EDL Kennedy Space Center 2025-01-27 —
Data Fusion to Estimate Vortex Location for Drag Reduction in Formation Flight Completed 3 Aerodynamics Armstrong Flight Research Center 2025-01-27 —
Advanced Thin Film PV UltraFlex Solar Array System, Phase II Completed — Detectors and Focal Planes Glenn Research Center 2025-01-27 —
A Stream Processing Engine Approach to Earth Science Data Processing, Phase I Completed — High-Performance Processors Stennis Space Center 2025-01-27 —
Real Time Monitoring and Test Vector Generation for Improved Flight Safety, Phase I Completed — Fire Detection, Suppression, and Recovery Langley Research Center 2025-01-27 —
Brine Dewatering Using Ultrasonic Nebulization, Phase I Completed 4 Water Recovery and Management Ames Research Center 2025-01-27 —
Software for Application of HHT Technologies to Time Series Analysis, Phase I Completed — Innovative Signal Modulations Goddard Space Flight Center 2025-01-27 —
Upper and Lower Bounds in Finite Element Analysis of Aerospace Structures, Phase II Completed — Food Production, Processing, and Preservation Armstrong Flight Research Center 2025-01-27 —
Titanium Heat Pipe Thermal Plane, Phase I Completed — Heat Transport Glenn Research Center 2025-01-27 —
Multi-Use Coating for Abrasion Prevention, Wear Protection, and Lunar Dust Removal, Phase I Completed — Particulate Contamination Prevention and Mitigation Glenn Research Center 2025-01-27 —
Advanced Product Water Removal and Management (APWR) Fuel Cell System, Phase I Completed — Electrochemical Storage: Fuel Cells Glenn Research Center 2025-01-27 —
Future NAS Flight Demand Generation Tool, Phase I Completed — Traffic Management Concepts Ames Research Center 2025-01-27 —
A Miniaturized and Robust FTS Sensor, Phase II Completed — Microwave, Millimeter Waves, and Submillimeter Waves Jet Propulsion Laboratory 2025-01-27 —
Integrated Structural Health Management, Phase I Completed — Reliability and Sustainment Glenn Research Center 2025-01-27 —
Aeorgel Insulation for Integrated Cryotanks and TPS, Phase II Completed — Insulation and Interfaces Marshall Space Flight Center 2025-01-27 —
Nanocomposite Thermolectric Materials by High Pressure Powder Consolidation Manufacturing, Phase I Completed — Below-Surface Mobility Jet Propulsion Laboratory 2025-01-27 —
Augmentation of Virtual Space Physics Observatory Services to Expand Data Access Capabilities, Phase I Completed — Intelligent Data Understanding Goddard Space Flight Center 2025-01-27 —
Market-Based Mechanisms for Efficient Allocation of NAS Resources, Phase I Completed — Traffic Management Concepts Langley Research Center 2025-01-27 —
GVT-Based Ground Flutter Test without Wind Tunnel, Phase I Completed — Aeroelasticity Armstrong Flight Research Center 2025-01-27 —
Control Suite and Teleoperator Interface for Whole-Body Mobile Manipulators, Phase I Completed — Execution and Control Johnson Space Center 2025-01-27 —
Panoramic Stereoscopic Video System for Remote-Controlled Robotic Space Operations, Phase I Completed — Large Apertures Johnson Space Center 2025-01-27 —
Alternative Nonvolatile Residue Analysis with Contaminant Identification Completed 3 Tools and Methodologies for Performing Systems Analysis Kennedy Space Center 2025-01-27 —
High Temperature Acoustic Noise Reduction Materials, Phase I Completed — Natural- and Induced-Environment Characterization and Mitigation Kennedy Space Center 2025-01-27 —
Superconducting Thin-Film Interconnects for Cryogenic Photon Detector Arrays, Phase II Completed — Detectors and Focal Planes Goddard Space Flight Center 2025-01-27 —
Nanostructured Fiber Optic Cantilever Arrays and Hybrid MEMS Sensors for Chemical and Biological Detection, Phase II Completed — Air, Water, Microbial, and Acoustic Sensors Marshall Space Flight Center 2025-01-27 —
Hybrid Cooling Loop Technology for Robust High Heat Flux Cooling, Phase I Completed — Heat Acquisition Jet Propulsion Laboratory 2025-01-27 —
Measurement and Assessment of Flow Quality in Wind Tunnels, Phase II Completed — Aerodynamics Langley Research Center 2025-01-27 —
A Discrete Event Simulation Model for Spaceport Operations (SPACESIM), Phase II Completed — Electrothermal Propulsion Kennedy Space Center 2025-01-27 —
← Previous Page 95 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.