Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 142 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
Wideband Imaging Submillimeter Heterodyne Spectrometer (WISHeS) Completed 3 Remote Sensing Instruments and Sensors Goddard Space Flight Center 2025-12-02 —
On-Board Limb-based Shape Modeling of Asteroids and Comets Completed 3 Modeling and Simulation for Flight Goddard Space Flight Center 2025-12-02 —
Mars Biosignature Extractor (MABEX) Completed 4 Sensors and Instruments Jet Propulsion Laboratory 2025-12-02 —
Distributed Systems Mission (DSM) Inter-satellite Communication Solutions (inter-satellite links, OMA) Completed 7 Communications, Navigation, and Orbital Debris Tracking and Characterization Systems Goddard Space Flight Center 2025-12-02 —
Innovative Uses for MET Technology: MET Particle Detector (MPD) Completed 2 Other Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
A Complete, Throwable, Lunar Volatiles Sensor Completed 3 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
Swarm Transmit and Receive Amplifier Systems Completed 5 Heat Rejection and Storage Goddard Space Flight Center 2025-12-02 —
Assessing Kinetic Inductance Detectors for Future Missions Completed 4 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
Two Spectrometers on a Chip Completed 1 Microwave, Millimeter Waves, and Submillimeter Waves California Institute of Technology 2025-12-02 —
Development of material properties of lnconel, titanium, and nickel alloys for process optimization of selective laser melting additive manufacturing Completed 1 Computational Materials University of Louisiana at Lafayette 2025-12-02 —
Investigation, Development and Demonstration of an SN Fast Forward Service for User Initiated Services (UIS) (SNFF) Completed 7 Information Assurance Goddard Space Flight Center 2025-12-02 —
Combining “Printed” Strain Gauges and Laser Measurements of Miniscule Sensor Displacements to Determine Upper Atmosphere Properties Completed 3 Environment Sensors Goddard Space Flight Center 2025-12-02 —
Cool Flames Completed 2 Other Aerospace Power and Energy Storage University of California-San Diego 2025-12-02 —
FY18 IRTD Instrumentation Ring (IR) for Cryogenic Operations Completed 4 Propulsion Systems Kennedy Space Center 2025-12-02 —
Compressive Sensing Architecture Study for Measuring Ice Topography Completed 2 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
Polylingual Experimental Terminal (PExT) Completed 5 Radio Frequency Glenn Research Center 2025-12-02 —
Miniaturized P-band RADAR Transceiver Completed — Microwave, Millimeter Waves, and Submillimeter Waves Goddard Space Flight Center 2025-12-02 —
Mission Concept Maturation for the Next-generation Spaceflight Laser Altimeter Mapping Mission Completed 4 Lasers Goddard Space Flight Center 2025-12-02 —
AI/ML-assisted Universal Discovery in Roman Light Curves Completed 4 Other Software, Modeling, Simulation, and Information Processing Goddard Space Flight Center 2025-12-02 —
Advanced Space Suit Project (formerly Extravehicular Activity Suit/Portable Life Support System) Completed 3 Logistics Management Johnson Space Center 2025-12-02 —
High-Resolution Fourier Transform Infrared Spectrometer for Outer Planetary Missions (PlanTIR) Completed 3 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
The NASA Technology Taxonomy Recommender System (T-Rex) Completed 9 Intelligent Data Understanding ARES Corporation 2025-12-02 —
Deep Space Quantum Link (DSQL) Completed 2 Quantum Communications Jet Propulsion Laboratory 2025-12-02 —
Material Characterization and Certification of Additively Manufactured Metal for Flight Hardware Applications Completed 4 Materials, Structures, Mechanical Systems, and Manufacturing Wallops Flight Facility 2025-12-02 —
Compact Ka-band Feed Design Validation and Shaped Reflector Design for ISS and Ka-band RF Comm Demonstration for future Earth Observing Missions Completed 4 Innovative Antennas Goddard Space Flight Center 2025-12-02 —
Development of Novel Receiver for Coherent Communications Completed 3 Communications, Navigation, and Orbital Debris Tracking and Characterization Systems Goddard Space Flight Center 2025-12-02 —
Deep Learning for Communication Limited Spacecraft (CLDL) Completed 4 Intelligent Data Understanding Goddard Space Flight Center 2025-12-02 —
Space Environmental Effects on Flight Experiment Materials Completed 7 Thermal Protection Materials Marshall Space Flight Center 2025-12-02 —
Sodium Lidar Laser Transmitter TRL Advancement Completed 4 Lasers Goddard Space Flight Center 2025-12-02 —
Combined artificial star, temperature lidar and magnetometer Completed 4 Lasers Goddard Space Flight Center 2025-12-02 —
Design of the Goddard Tethered-Balloon Observation Sensor System (GT-BOSS) for Boundary Layer Measurements Completed 4 In Situ Instruments and Sensors Goddard Space Flight Center 2025-12-02 —
Robust and Resilient Autonomy for Advanced Air Mobility (AVIATE) Completed 3 Safe All-Vehicle Access University of Illinois at Urbana-Champaign 2025-12-02 —
First Flight for a prototype non high voltage electron spectrometer for lower atmosphere studies Completed 5 Field and Particle Detectors Goddard Space Flight Center 2025-12-02 —
Weather Intelligent Navigation Data and Models for Aviation Planning (WINDMAP) Completed 4 Weather and Environment Oklahoma State University-Main Campus 2025-12-02 —
Multiband RF Receiver Front End for Data Relay Ka-band uplinks and crosslinks Completed 4 Spectrum Efficiency Goddard Space Flight Center 2025-12-02 —
Quantifying bimetallic joints formed using direct metal deposition processes to improve the reliability and increase the technical readiness level for an additive manufactured rocket engine component Completed 2 Grappling Technologies University of Alabama in Huntsville 2025-12-02 —
Adaptive Compliant Trailing Edge II Sub-Project (ACTE II) Completed 6 Advanced Atmospheric Flight Vehicles Armstrong Flight Research Center 2025-12-02 —
Sublimation Rates and Sample Stability for In Situ Ocean Worlds Measurements Completed 6 Sample Handling Goddard Space Flight Center 2025-12-02 —
High Temperature Electronics Completed 5 Environment Sensors Jet Propulsion Laboratory 2025-12-02 —
Improved Estimate of Sample Mass by Piezo Impedance Sensing Completed 4 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
Tank Health Monitoring Completed 6 Materials, Structures, Mechanical Systems, and Manufacturing Carthage College 2025-12-02 —
Next Generation Laser for Vegetation Canopy and Cryosphere Altimetry Missions Completed 5 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
Verification of Molecular Contamination Transport Model Completed 4 Modeling Goddard Space Flight Center 2025-12-02 —
Next-generation Goddard multi-regime GNSS receiver Completed 4 Communications, Navigation, and Orbital Debris Tracking and Characterization Systems Goddard Space Flight Center 2025-12-02 —
BioSentinel Completed 6 Long-Duration Health Ames Research Center 2025-12-02 —
Opening the Door to New Science -- Enabling High Speed (40Mbps) Telemetry for Sounding Rocket Experiments Completed 4 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
CubeSat Capabilities for Space Science Missions Completed 4 Microwave, Millimeter Waves, and Submillimeter Waves Goddard Space Flight Center 2025-12-02 —
FY18-C2 GRC: Green Propulsion Catalyst Test Article Canceled 4 Electrostatic Propulsion Glenn Research Center 2025-12-02 —
ProSECT: Programmable Scanning Experiment for Cloud Tomography Completed 4 Microwave, Millimeter Waves, and Submillimeter Waves Goddard Space Flight Center 2025-12-02 —
A Thermal Imaging Instrument with Uncooled Detectors Completed 3 Detectors and Focal Planes Goddard Space Flight Center 2025-12-02 —
← Previous Page 142 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.