Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 179 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
Experimental Evaluation of Geopolymer and 'Lunamer' Binders as Radioactive Shielding Materials for Space Applications Project Completed 2 — Stennis Space Center 2025-12-18 —
High Reflectance Silicon Dielectric Mirrors for Infrared Astronomy Completed 7 Optical Components Goddard Space Flight Center 2025-12-18 —
Pulsed Plasma Rocket: Shielded, Fast Transits for Humans to Mars Completed 2 Solar Thermal Propulsion Howe Industries, LLC 2025-12-18 —
Shape-Morphing Adaptive Radiator Technology, Year 2 (SMART) Completed 3 Heat Rejection and Storage Johnson Space Center 2025-12-18 —
Evaluation of Carbon Composite Vessels Fabrication using Ionic Liquid Epoxies for Cryogenic Liquid Containment Completed 5 — Marshall Space Flight Center 2025-12-18 —
Dynamics and Design of Open, Self-Regulating, Capillary Flow Networks for Space Micropropulsion Applications Completed 3 Electrostatic Propulsion California Institute of Technology 2025-12-18 —
Developing an Adaptive Robotic Assistant for Close-Proximity Human-Robot Interaction in Space Environments Completed 3 Human and Robot Interaction Massachusetts Institute of Technology 2025-12-18 —
Development of Spike Ejector Technology Completed 5 Propulsion, Exhaust, and Propellant Management Stennis Space Center 2025-12-18 —
Enhancing Thermal Transport Properties of Nanocomposites Completed 3 Lightweight Structural Materials Vanderbilt University 2025-12-18 —
Parachute Canopy Instrumentation Platform, Year 1 (PCIP) Completed 6 Instrumentation and Health Monitoring for EDL Johnson Space Center 2025-12-18 —
Direct Multipixel Imaging and Spectroscopy of an Exoplanet with a Solar Gravitational Lens Mission Completed 4 Other Sensors and Instruments Jet Propulsion Laboratory 2025-12-18 —
Rapid and Simple Sample Acquisition During Space Flight: Simultaneous Extraction of Proteins and Nucleic Acids from Bodily Fluids and Cabin Water Using Free-Flow Bi-directional Isotachophoresis Completed 3 Sample Acquisition and Handling Texas A & M University-College Station 2025-12-18 —
A Numerical Method to Generate Reference Trajectories for Optimization Methods to Support Low-Thrust Mission Design Completed 3 Trajectory Design and Analysis Purdue University-Main Campus 2025-12-18 —
High-Rate, Large-Area Deposition of Magnetic Materials for Next-Generation Energy Technologies Active 2 Electrical Power Conversion and Regulation The University of Texas at Austin 2025-12-18 High
New Approaches in III-Nitride-Based Devices for Next-Generation Planetary and Astrophysics Missions Completed 3 — Jet Propulsion Laboratory 2025-12-18 —
TechEdSat Completed 7 — Ames Research Center 2025-12-18 —
Nonprehensile Terrain Manipulation for Planetary Rover Mobility Enhancement Completed 3 Surface Mobility Carnegie Mellon University 2025-12-18 —
Broadband Electrically Tunable Monolithic Mid-Infrared Laser Completed 4 Environment Sensors Northwestern University 2025-12-18 —
Robust Planning for Dynamic Tensegrity Structures Completed 3 Surface Mobility Rutgers University-New Brunswick 2025-12-18 —
Conductivity of AM Lunar Regolith Components via Graphene Nanoplatelets Completed 3 In Situ Resource Use — 2025-12-18 —
Bi- or Tri- Propellant Rocket with Thrust Augmented Nozzle, Light Version Canceled 4 Cryogenic Propulsion Armstrong Flight Research Center 2025-12-18 —
Relative Motion and Proximity Operations Beyond Earth Orbit Completed 3 Onboard Navigation Algorithms The University of Texas at Austin 2025-12-18 —
Development of conical off-plane gratings for future X-ray spectrometers Completed 3 Optical Components Pennsylvania State University-Main Campus 2025-12-18 —
Enhanced Cryogen Transfer via a TVS Augmented Injector (CryoTI) Completed 5 Integrated Systems and Ancillary Technologies Marshall Space Flight Center 2025-12-18 —
Cryogenic Selective Surfaces Completed — — Kennedy Space Center 2025-12-18 —
Targeting "Absolute" Salinity for Earth and Space Completed 2 — Johnson Space Center 2025-12-18 —
High Thrust-Density Electrostatic Engines Project Completed 7 — Glenn Research Center 2025-12-18 —
KSC In-Situ Resource Utilization (ISRU) Technologies Completed 4 Resource Processing for Production of Mission Consumables Kennedy Space Center 2025-12-18 —
Flat Fabrication of Progressively Self-Assembling Space Systems Completed 2 Deployables, Docking, and Interfaces Auburn University 2025-12-18 —
3D Printed Habitat - Structural Member Competition Completed 3 Surface Construction and Assembly Kennedy Space Center 2025-12-18 —
Sweeping Arrays for Film Cooling, Year 1 Completed 4 — Glenn Research Center 2025-12-18 —
Reusable, Aeroassisted Orbit Transfer Vehicle Development that Mitigates Mars Transportation System Risks Completed 1 Architecture Design and Analysis Langley Research Center 2025-12-18 —
3D Print Small Flight Heat Shield Prototype, Year 3 Completed 4 Thermal Protection Systems Johnson Space Center 2025-12-18 —
PICULS: Photonic Integrated Circuits for Ultra-Low Size, Weight and Power Completed 4 Quantum Communications University of California-Santa Barbara 2025-12-18 —
Advanced Fuel Forms for Nuclear Thermal Propulsion Applications Completed 3 Nuclear Thermal Propulsion The University of Tennessee-Knoxville 2025-12-18 —
ISRU-Martian Dust Filter (MDF-BAA) Completed 5 Resource Acquisition, Isolation, and Preparation BlazeTech 2025-12-18 —
Enabling Hybrid Aerospace Structures Completed 6 Manufacturing Processes Glenn Research Center 2025-12-18 —
Optimizing plant canopy photon capture efficiency for bioregenerative life support systems Completed 3 Transformative Health and Performance Concepts University of Colorado Boulder 2025-12-18 —
Tunable, Resettable, Printable, Impact Energy Absorbing Matrix Completed 2 Air, Water, Microbial, and Acoustic Sensors Goddard Space Flight Center 2025-12-18 —
TRL Advancement of 3D Printed Electronics Packaging Completed — Electronic Packaging and Implementations Marshall Space Flight Center 2025-12-18 —
A DC Transformer, Year 1 Completed 3 — Kennedy Space Center 2025-12-18 —
A DC Transformer, Year 2 Completed 3 — Kennedy Space Center 2025-12-18 —
Microwave Kinetic Inductance Detector Development Completed 3 Optical Components University of California-Santa Barbara 2025-12-18 —
Institute for Ultra-Strong Composites by Computational Design (US-COMP) Completed 2 Lightweight Structural Materials Michigan Technological University 2025-12-18 —
Luminescence Cryothermometry, Year 1 Completed 2 In Situ Manufacturing, Maintenance, and Repair Glenn Research Center 2025-12-18 —
Lunar Propellant Production Plant (LP3-TP) Completed 5 Resource Processing for Production of Manufacturing, Construction, and Energy Storage Feedstock Materials Skyre, Inc. 2025-12-18 —
Ceramic Coatings for Electric Aircraft Propulsion Completed 3 Electric Space Propulsion Glenn Research Center 2025-12-18 —
600W Hall Thruster Qualification Life Test (Hall Qual) Completed 6 Aerospace Power and Energy Storage Busek Company, Inc. 2025-12-18 —
Boron Nitride Aid for High-Z X-ray Optics and Substrate Enhancements Completed 4 Mirror Systems Goddard Space Flight Center 2025-12-18 —
Guidance and Control of Electrospray Thruster Actuated CubeSat Completed 3 Electrostatic Propulsion Massachusetts Institute of Technology 2025-12-18 —
← Previous Page 179 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.