Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 143 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
Wallops 6U Deployer Improvements Completed 5 Deployables, Docking, and Interfaces Goddard Space Flight Center 2025-12-02 —
In-Situ Resource Utilization: Methane Fuel Production (ISRU) Completed 4 Resource Processing for Production of Mission Consumables Glenn Research Center 2025-12-02 —
Schematic Window Methodology Project Completed 4 Mission Planning Goddard Space Flight Center 2025-12-02 —
Application of Machine Learning to Planetary Spectroscopy Completed 6 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
WASP - Wallops Arc Second Pointer (WASP) Completed 7 Detectors and Focal Planes Wallops Flight Facility 2025-12-02 —
CO2 Sounder Lidar for Earth Science Missions Completed 4 Lasers Goddard Space Flight Center 2025-12-02 —
An Onboard Implementation of Autonomous Celestial Navigation Completed 3 Navigation Technologies Goddard Space Flight Center 2025-12-02 —
Design and Testing of Advanced Composites and Coatings for Radiation Environment Shielding Applicable to Crew Vehicles, Habitats, and Avionics (ACCRES) Completed 2 Materials for Extreme Environments Marshall Space Flight Center 2025-12-02 —
Toward Fine Strip Pitch Germanium Detectors in Space Completed 6 Cryogenic/Thermal Systems Goddard Space Flight Center 2025-12-02 —
Series-Bosch System for CO2 Reduction/Resource Recovery Completed 2 Logistics Management Environmental Control and Life Support Systems Branch 2025-12-02 —
Development of absolute radiometric response functions for HyPlant & G-LiHT using SIRCUS: Spectral Irradiance and Radiance responsivity Calibrations using Uniform Sources (SIRCUS) Completed 6 Detectors and Focal Planes Goddard Space Flight Center 2025-12-02 —
Flow Boiling and Condensation Experiment (FBCE) Completed 6 Thermal Management Systems Glenn Research Center 2025-12-02 —
A Microbial Characterization System for Advancing Planetary Protection Bioburden Assessments Completed 4 Planetary Protection Goddard Space Flight Center 2025-12-02 —
Integrated/Arrival/Departure/Surface Operations Completed 4 Traffic Management Concepts Ames Research Center 2025-12-02 —
Mars Subsurface Access (MSA) Completed 3 Sample Acquisition and Handling Jet Propulsion Laboratory 2025-12-02 —
FY18-C2 GRC: Light-Weight Hollow-Strut Metal Foam Supported- Solid Oxide Fuel Cells Completed 3 Electrochemical Storage: Fuel Cells Glenn Research Center 2025-12-02 —
Tunable Fiber Laser for OH LIF: Tunable fiber laser Completed 3 Lasers Goddard Space Flight Center 2025-12-02 —
Quantifying Radiation Storm Impacts on Interplanetary Missions (Radiation Storm Impacts) Completed — Space Weather Prediction Goddard Space Flight Center 2025-12-02 —
Precise Laser Measurements of Miniscule Electric Field Sensor Displacements to Determine Upper Atmosphere Properties Completed 3 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
Dedicated High-Performance Radiation-Tolerant Processor for On-Board Instrument Processing and In-Situ Science Autonomy (RADICAL) Completed 3 High-Performance Processors Goddard Space Flight Center 2025-12-02 —
Wallops Flight Facility Power Switching Unit (WFFPSU) Completed 7 Distribution and Transmission Wallops Flight Facility 2025-12-02 —
Floating Slosh Damper Development Completed 4 Integrated Systems and Ancillary Technologies Marshall Space Flight Center 2025-12-02 —
Rust in cFS: Prevent Bugs with Memory-Safe Programming Completed 4 Frameworks, Languages, Tools, and Standards Goddard Space Flight Center 2025-12-02 —
FY18-C1 GRC Combined Structural Dynamic Testing Methodology for Large Non-Linear Structures Completed 3 Mechanical and Structural Integrity Testing Glenn Research Center 2025-12-02 —
Handheld Laser Mass Spec System for Light Volatile and Isotope Analysis on the Moon. Completed 1 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
Additive Manufacturing of Refractory Metal Nb Alloy C103 for Propulsion Applications Completed 3 Manufacturing Processes Castheon Inc. 2025-12-02 —
Particle filter Simulation and Analysis Enabling Non-Traditional Navigation Project Completed 4 Onboard Navigation Algorithms Goddard Space Flight Center 2025-12-02 —
GPS Low Cross-polarization Antenna Array for Orbit Determination beyond Geostationary Earth Orbits Completed 2 Microwave, Millimeter Waves, and Submillimeter Waves Goddard Space Flight Center 2025-12-02 —
Interface Mixing Mechanisms in the Additive Manufacturing of Copper and Nickel Based Alloys and their Influence on Repeatability and Reliability Completed 3 Materials Marshall Space Flight Center 2025-12-02 —
Integrated Zero-Emission Aviation (IZEA) using a Robust Hybrid Architecture (IZEA) Active 2 Hybrid Electric Systems Florida State University 2025-12-02 High
Lunar Position, Navigation, and Timing (PNT) Active 5 Communications, Navigation, and Orbital Debris Tracking and Characterization Systems Goddard Space Flight Center 2025-12-02 Medium
Passively Compensated Low-Power Chip-Scale Clocks for Wireless Communication in Harsh Environments Completed 3 Timekeeping and Time Distribution Stanford University 2025-12-02 —
A Low-Cost Vacuum Compatible Camera to Enable Key Demonstrations for the Habitable Worlds Observatory and Beyond Completed 4 Detectors and Focal Planes Goddard Space Flight Center 2025-12-02 —
Autonomous On-Board Optical Navigation Software Completed 4 Onboard Navigation Algorithms Goddard Space Flight Center 2025-12-02 —
Position Correlated Vision Dataset from Multirotor and Fixed-wing sUAS of General Aviation aircraft, Fixed-wing sUAS, Multirotor sUAS, and Birds Completed 4 GN&C Langley Research Center 2025-12-02 —
Ku/X-band Smallsat Precipitation Radar Concept Development Completed 6 Microwave, Millimeter Waves, and Submillimeter Waves Goddard Space Flight Center 2025-12-02 —
Onset of the Organic Processing Analytical Laboratory (OPAL) Completed 3 In Situ Resource Use Goddard Space Flight Center 2025-12-02 —
Spacecraft Loads and Acoustic Measurement System (SLAM) Completed 6 Materials, Structures, Mechanical Systems, and Manufacturing Wallops Flight Facility 2025-12-02 —
FY17 GRC: TREES - Thermal Recovery Energy Efficient System Completed 3 Thermal Conditioning for Sensors, Instruments, Samples, and High-Efficiency Electric Motors Glenn Research Center 2025-12-02 —
ICS Technology Demonstration Mission (Impulse Control System) Completed 5 GN&C Goddard Space Flight Center 2025-12-02 —
Compact Flight-Path High-Speed High-Voltage Pulse Driver Module to Advance Instrumentation for Planetary and Lunar Science Applications Completed 2 Electronics Goddard Space Flight Center 2025-12-02 —
Low SWaP Multichannel Analog Pulse Waveform Read-out on a Chip for Lidar Completed 4 Remote Sensing Instruments and Sensors Goddard Space Flight Center 2025-12-02 —
Human Factors and Habitability Assessment Tool Completed 6 Habitability and Environment Johnson Space Center 2025-12-02 —
Low-cost Mars EDL solutions Completed 2 Entry, Descent, and Landing Langley Research Center 2025-12-02 —
Development and Flight Test of Modernized Electronics for Mesosphere/Lower Thermosphere Fields Payload Completed 6 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
Container Flight Software Completed 4 Cyber Infrastructure Goddard Space Flight Center 2025-12-02 —
High Pressure Transcritical Combustion (HPTC Combustion) Completed 2 Aero Propulsion Glenn Research Center 2025-12-02 —
Development of Wideband, Dual Polarized L-Band Array Antenna for Digital Beam forming SAR Completed 2 Structures and Antennas Goddard Space Flight Center 2025-12-02 —
Low-Power, Fault-Tolerant, Hybrid Instrument Processor Completed 3 Low-Power Embedded Computer Systems Goddard Space Flight Center 2025-12-02 —
Measuring the coating stress of DC-magnetron sputtered Ir on curved Si substrates Completed 5 Coatings Goddard Space Flight Center 2025-12-02 —
← Previous Page 143 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.