Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 144 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
The Deep Space Positioning System-Navigator (DPS-Navigator) Completed 6 Onboard Navigation Algorithms Jet Propulsion Laboratory 2025-12-02 —
Wireless Sensor Dots for Advanced Vehicle Measurements Completed 4 Sensors and Instruments Marshall Space Flight Center 2025-12-02 —
Center for High-Efficiency Electrical Technologies for Aircraft (CHEETA) Completed 1 All-Electric Propulsion University of Illinois at Urbana-Champaign 2025-12-02 —
OH Solar Radiometer Completed 3 Optical Components Goddard Space Flight Center 2025-12-02 —
Next Generation Micro-Shutter: high yield fabrication architecture demonstration test Completed 4 Optical Components Goddard Space Flight Center 2025-12-02 —
Near-Noiseless Phase-Sensitive Pre-amplifier for Ultra-high Receiver Sensitivity in 10 Gbps and Above Optical Near-Earth/Near-Lunar Satellite Networks Completed 3 Optical Components Goddard Space Flight Center 2025-12-02 —
Non-Contact Creep Characterization of High Temperature Materials for Nuclear Thermal Propulsion Completed 3 Nuclear Thermal Propulsion Marshall Space Flight Center 2025-12-02 —
Graphene Chemical Sensor Project Completed 1 Environment Sensors Goddard Space Flight Center 2025-12-02 —
RCA: Modeling Tools for CLmax Prediction Completed 2 Flight Vehicle Systems Langley Research Center 2025-12-02 —
Compact High OPR Gas Generator Completed 2 Turbine-Based Jet Engines Glenn Research Center 2025-12-02 —
Metrology for the Development of Segmented X-ray Mirror Assemblies Utilizing Fizeau Interferometric Stitching Completed 3 Mirror Systems Goddard Space Flight Center 2025-12-02 —
Additively Manufactured Integral Turbine Blade Tuned Mass Absorber Completed 4 Electric Space Propulsion Marshall Space Flight Center 2025-12-02 —
Electrolytic Oxygen Production Technology for Advanced ECLSS Completed 3 Atmosphere Revitalization Marshall Space Flight Center 2025-12-02 —
An Assessment of UV Sensor Materials and Architectures for Sensitive UV Spectrometer Production Completed 3 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
Breadboarding FETCH, the Faraday Effect Tracker for Coronal and Heliospheric Structures (FETCH) Completed 4 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
Novel Deployable Sunshade Completed 6 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
Green Lab Certification Completed — — Kennedy Space Center 2025-12-02 —
Development of a High Fidelity Solar Sail Dynamics Model Completed 2 Solar Sails Marshall Space Flight Center 2025-12-02 —
Balloon-Borne Cryogenic Telescope Testbed (BOBCAT) Completed 4 Microwave, Millimeter Waves, and Submillimeter Waves Goddard Space Flight Center 2025-12-02 —
PIC-ASIC Spectrometer Demonstration for Ultrawideband and Hyperspectral Microwave Sounding (PICASIC) Completed 3 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
NextSTEP Phase 2 Environmental Control Life Support Systems Modularity Study (NSTEP ECLSS) Completed 3 Atmosphere Revitalization NASA Headquarters 2025-12-02 —
Formaldehyde Differential Absorption Spectroscopy Completed 2 Lasers Goddard Space Flight Center 2025-12-02 —
Lidar Laser Development and PBL Detection Techniques Completed 3 Lasers Goddard Space Flight Center 2025-12-02 —
Low Loss Amorphous Silicon for MKID Detectors Completed 3 Detectors and Focal Planes Goddard Space Flight Center 2025-12-02 —
High-Efficiency Feedhorn-Coupled Detector Arrays to Enable Next-Generation Space-Based CMB Polarization Missions Completed 4 Detectors and Focal Planes Goddard Space Flight Center 2025-12-02 —
Adaptive Aerostructures for Revolutionary Civil Supersonic Transportation Completed 3 Advanced Atmospheric Flight Vehicles Texas A & M University-College Station 2025-12-02 —
Spaceflight Injectable Delivery System Canceled 4 Behavioral Health and Performance Johnson Space Center 2025-12-02 —
GeneLab Active 9 Collaborative Science and Engineering Ames Research Center 2025-12-02 Low
Wide-Band Phase Calibration Spectral Analyzer Completed 3 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
Performance Characterization the Compact Astrometric Alignment Sensor (CAAS) for Precision Formation Flying (CAAS) Completed 4 Other GN&C Technologies Goddard Space Flight Center 2025-12-02 —
Commercial TDRS compatible cubesat communications solution Completed 6 Quantum Communications Goddard Space Flight Center 2025-12-02 —
Exploration Docking Hatch (EDH) Completed 7 Deployables, Docking, and Interfaces Johnson Space Center 2025-12-02 —
A Laboratory Demonstration of Quantum-Noise-Limited Amplifiers for Future Instruments at both GHz and mm bands (LDQNLA) Completed 4 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
Development of a compact optical pointing and tracking design to correct ranging error in laser satellite to satellite tracking (PAT) Completed 3 Pointing, Acquisition, and Tracking Techniques and Technologies Goddard Space Flight Center 2025-12-02 —
Frequency agile heterodyne detector for submillimeter spectroscopy of planets and comets Completed 2 Detectors and Focal Planes Jet Propulsion Laboratory 2025-12-02 —
Preliminary Investigation into Dissolvable Supports for Additively Manufactured Inconel 718 Components Completed 2 Manufacturing Processes Arizona State University-Tempe 2025-12-02 —
Miniaturized Scrubber System for Long Duration Exploration and Habitation Applications (MSS) Completed 3 Atmosphere Revitalization Dynetics, Inc. 2025-12-02 —
Enabling Rapid, End-To-End, Medium-Fidelity Optimization of New Classes of Planetary Science Missions Completed 5 Other Communications, Navigation, and Orbital Debris Tracking and Characterization Systems Goddard Space Flight Center 2025-12-02 —
Logistics Materials for Reuse Completed 3 Waste Management Kennedy Space Center 2025-12-02 —
ESCAPE Mirror Module Assembly Development (ESCAPE MMA) Completed 3 Optical Components Marshall Space Flight Center 2025-12-02 —
Radiometer Concept Design for the Future of Precipitation Mapping Completed 2 Microwave, Millimeter Waves, and Submillimeter Waves Goddard Space Flight Center 2025-12-02 —
Development and Characterization of Detector Electrodes of Molecular Electronic Transducer Seismometers Completed 3 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
Artemis Suit Materials (ASM) Active 3 Human Health, Life Support, and Habitation Systems Johnson Space Center 2025-12-02 High
Novel Ionic Liquid Monopropellant Development Completed 3 Integrated Systems and Ancillary Technologies Marshall Space Flight Center 2025-12-02 —
Enabling Time-Domain/Multi-Messenger Mission Readiness (ETDAMMR) Completed 3 Software, Modeling, Simulation, and Information Processing Goddard Space Flight Center 2025-12-02 —
Process Development of Rapid Powder Removal for AM GRCop Copper Alloys Completed 1 Ground and Surface Logistics Marshall Space Flight Center 2025-12-02 —
Engineering Concept Design & Assembly in VR Program Completed 5 Collaborative Science and Engineering Goddard Space Flight Center 2025-12-02 —
Autonomous Navigation for Co-Orbiting Spacecraft (AIDNav) Completed 6 Navigation Technologies Goddard Space Flight Center 2025-12-02 —
Precision Landing of a Hexacopter Drone by Smartphone Video Guidance Sensor Completed 3 Entry, Descent, and Landing Marshall Space Flight Center 2025-12-02 —
511 keV Focusing Telescope Completed 3 Sensors and Instruments Goddard Space Flight Center 2025-12-02 —
← Previous Page 144 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.