Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 152 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
Modeling the Operational Limits of Extreme Environment Electronics for Lunar/Martian Fission Surface Power (FSP) Completed 3 Power Management and Distribution Glenn Research Center 2025-12-18 —
Integrated Focal Plane Wavefront Estimating for Space Mission Coronagraphs Completed 4 Detectors and Focal Planes Ames Research Center 2025-12-18 —
Fast and Accurate Detection of Cosmic Ray Contamination in JWST Data Completed 3 Intelligent Data Understanding Ames Research Center 2025-12-18 —
Control and Modeling of Extensible Continuum Robots Completed 3 Multimodal and Proximate Interaction Clemson University 2025-12-18 —
Porous Silicon for Enhanced Detectors Completed 6 Detectors and Focal Planes Goddard Space Flight Center 2025-12-18 —
Photon Counting Sensor for In-space Debris Detection Completed 3 Detector Development — 2025-12-18 —
The Fabrication of Ultra-Lightweight Full-Shell X-ray Optics by 3D-Printing, Year 2 Completed 2 Manufacturing Processes Marshall Space Flight Center 2025-12-18 —
Automaton Rover for Extreme Environments (AREE) Completed 3 Extreme Environments Related to Critical System Health Management Jet Propulsion Laboratory 2025-12-18 —
Variable Emittance Coating Completed 4 Heat Rejection and Storage Johnson Space Center 2025-12-18 —
Investigation of Environmental Impact Discharge of Elevated Temperature Water into SSC's Canal System Completed 8 — Stennis Space Center 2025-12-18 —
Enhanced Autonomous Refueling Capability for Gateway and Surface Systems Completed 5 Autonomous Systems Stennis Space Center 2025-12-18 —
Interface Anywhere Completed 3 — Johnson Space Center 2025-12-18 —
Directed Energy for Interstellar Study Completed 3 Solar Thermal Propulsion University of California-Santa Barbara 2025-12-18 —
Advanced Terrain Imaging with Communication Signals, Year 1 Completed 6 Cognitive Networking Glenn Research Center 2025-12-18 —
Tactile Sensing with Fiber Optics Completed 3 — Armstrong Flight Research Center 2025-12-18 —
Additive Manufacturing Investigations Completed 3 Manufacturing Processes Marshall Space Flight Center 2025-12-18 —
Patterned magnetic hold and separation techniques to reduce pyrotechnic use Completed 4 Deployables, Docking, and Interfaces Armstrong Flight Research Center 2025-12-18 —
Simulated Martian Exposure to Solid Propellant Completed 4 — Marshall Space Flight Center 2025-12-18 —
Characterization of Dynamic Thermal Control Schemes and Heat Transfer Pathways for Incorporating Variable Emissivity Electrochromic Materials into a Space Suit Heat Rejection System Completed 3 Heat Transport University of Colorado Boulder 2025-12-18 —
Optimizing thin cover layers for optically clear EDS dust removal Completed 4 Particulate Contamination Prevention and Mitigation Kennedy Space Center 2025-12-18 —
Nanostructures for Advanced Imaging and Detector Devices, Year 1 Completed 3 Detectors and Focal Planes Goddard Space Flight Center 2025-12-18 —
A Multiscale Approach to Magnesium Intercalation Batteries: Safer, Lighter, and Longer-Lasting Completed 3 Electrochemical Storage: Batteries Texas A & M University-College Station 2025-12-18 —
Trichloride Ionic Liquid Mediated Metal Extraction from Regolith Completed 2 Resource Processing for Production of Mission Consumables Marshall Space Flight Center 2025-12-18 —
Laboratory Demonstration and Test of Solar Thermal Asteroid ISRU Completed 4 Resource Acquisition, Isolation, and Preparation Missouri University of Science and Technology 2025-12-18 —
MitoMars: Targeted Mitochondria Replacement Therapy to Boost Deep Space Endurance Completed — Human Health, Life Support, and Habitation Systems Ames Research Center 2025-12-18 —
Aerosciences (AEROS) Completed 6 Integrated Modeling and Simulation for EDL Ames Research Center 2025-12-18 —
Electrodynamic Dust Shield Coating Pattern for Solar Cells Completed — Particulate Contamination Prevention and Mitigation Kennedy Space Center 2025-12-18 —
Mars Magnetoshell Decelerator EDL-SA study Completed 2 Hypersonic Decelerators Langley Research Center 2025-12-18 —
Explainable and Scalable Planning with Probabilistic Temporal Logic Specifications Completed 4 Mission Planning and Scheduling The University of Texas at Austin 2025-12-18 —
Terrestrial HIAD Orbital Reentry (THOR) Canceled 4 Aerodynamic Decelerators Langley Research Center 2025-12-18 —
Exploring the Feasibility of Additive Manufacturing (AM) for Thermal Protection Systems (TPS) Completed 2 Thermal Protection Systems Ames Research Center 2025-12-18 —
Characterization of Printed Components Under Space Conditions Completed 3 Digital Transformation Technologies for Manufacturing South Dakota School of Mines and Technology 2025-12-18 —
Plasmonic Enhanced Graphene Long-Wavelength Photodetector for Earth Radiation Budget Instruments Completed 3 Detectors and Focal Planes Langley Research Center 2025-12-18 —
Implementing a Near-Optimal Optical Receiver for Inter-Planetary Communication Completed 3 Detector Development Northwestern University 2025-12-18 —
Feature Tracking and Dynamic Measurement for Novel Science Completed 3 Situational and Self-Awareness Technologies Jet Propulsion Laboratory 2025-12-18 —
Design of metastable high entropy alloys for additive manufacturing Completed 3 Manufacturing Processes Cornell University 2025-12-18 —
Advanced coatings for robust; reusable; and low-cost thermal protection systems (TPS) Completed 2 Thermal Protection Systems Johnson Space Center 2025-12-18 —
Acidic Aerosol Separator Apparatus (ASA) For Venus Aerosol Mass Spectrometer (VAMS), Year 2 Completed 4 Sample Handling Jet Propulsion Laboratory 2025-12-18 —
Development of a Lightweight Mobility System for a Passive Tensegrity Lander Completed 3 Informatics and Decision Support Systems Ames Research Center 2025-12-18 —
Biomineralization-Enabled Self-Growing Building Blocks for Habitat Outfitting on Mars Completed 2 Manufacturing Processes University of Nebraska-Lincoln 2025-12-18 —
MeDiCNE - Metabolomics-based Disease Characterization via Needle Trap Extraction Completed 2 Medical Diagnosis and Prognosis Ames Research Center 2025-12-18 —
Wireless Power Transfer for High Temperature Applications Completed 3 — Glenn Research Center 2025-12-18 —
100 eV Resolution Detectors for Hard X-ray Doppler Tomography of Supernova Remnants Completed 3 Detectors and Focal Planes California Institute of Technology 2025-12-18 —
Decision Support for Water Management inthe Agriculture Sector Completed 4 Intelligent Data Understanding — 2025-12-18 —
Reconstituting Asteroids into Mechanical Automata Completed 2 Resource Acquisition, Isolation, and Preparation Made in Space, Inc. 2025-12-18 —
Work Execution for Integrated Display and Environmental Awareness System (WeIDEAS) Completed 6 — Kennedy Space Center 2025-12-18 —
Input Waste Stream Modeling for Trash Management, Recycling and Manufacturing Processes Completed 3 Waste Management Kennedy Space Center 2025-12-18 —
Great Observatory for Long Wavelengths (GO-LoW) Completed 3 Distributed Aperture Massachusetts Institute of Technology 2025-12-18 —
Drag Reduction by Off-Body Energy Deposition, Year 3 Completed 4 Aerodynamics Langley Research Center 2025-12-18 —
Thirsty Walls - A new paradigm for air revitalization in life support Completed 3 Atmosphere Revitalization Johnson Space Center 2025-12-18 —
← Previous Page 152 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.