Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 161 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
LOX-CH4 Propulsion Completed 6 — Blue Origin, LLC 2025-12-18 —
Dynamic Control for Directed Evolution: A New Tool for Robust Bioengineering Completed 7 — Ames Research Center 2025-12-18 —
Electrodynamic Dust Shield on Lunar Solar Arrays Completed — Photovoltaic Electrical Power Glenn Research Center 2025-12-18 —
Ultra-high Pressure Promoted Combustion Completed 7 Cryogenic Propulsion Johnson Space Center 2025-12-18 —
Uncovering the Solution Space of Chaotic Systems via Multi-Objective Reinforcement Learning Completed 3 Science Modeling University of Colorado Boulder 2025-12-18 —
Lunar South Pole Oxygen Pipeline Completed 2 Manufacturing Processes Lunar Resources, Inc. 2025-12-18 —
Characterization of Inner Front Pole Cover Erosion in Center Mounted Cathode Hall Thrusters using Thompson Scattering Completed 3 Electrostatic Propulsion Georgia Institute of Technology-Main Campus 2025-12-18 —
Superelastic, Non-Pneumatic Tire for Space & Terrestrial Applications, Year 1 Completed 4 — Glenn Research Center 2025-12-18 —
Detectors for Measurements of the Cosmic Microwave Background Radiation Completed 3 Detectors and Focal Planes University of Wisconsin-Madison 2025-12-18 —
Exploration of Composite 3D Carbon Foams for Radiation Shielding and 2D allotropes of Carbon for Direct Lunar Applications Completed — Protection Systems Goddard Space Flight Center 2025-12-18 —
Coupler for Propellant Transfer (CPT-TP) Completed 5 Cryogenic Propulsion SpaceX 2025-12-18 —
III-V Microsystem Components for Positioning, Navigation and Timing in Extreme Harsh Environments Completed 3 Timekeeping and Time Distribution Stanford University 2025-12-18 —
Pulsed Plasma Transit System Completed 3 — Ames Research Center 2025-12-18 —
Experimental Validation of Charged Lunar Dust Dynamics Simulations, Year 2 Completed 5 Particulate Contamination Prevention and Mitigation Kennedy Space Center 2025-12-18 —
Advanced Energy Storage Systems (AESS) Completed 6 — Glenn Research Center 2025-12-18 —
Photon-Counting Integrated Circuit (PCIC) Photodetector Arrays Completed 4 Detectors and Focal Planes Ames Research Center 2025-12-18 —
Active Full-Shell X-Ray Optics, Year 2 Completed 4 Mirror Systems Marshall Space Flight Center 2025-12-18 —
Surface Passivation of Lithium-Ion Electrodes: A Path to High-Performance Energy Storage Completed 3 Advanced Concepts for Energy Storage The University of Texas at Austin 2025-12-18 —
No Moving Part Stirling Power, Year 1 Completed 4 Dynamic Energy Conversion Glenn Research Center 2025-12-18 —
Metal Extraction Lunar Technology from Carbothermal Reduction (MELT-CR) Completed 3 In Situ Manufacturing, Maintenance, and Repair Marshall Space Flight Center 2025-12-18 —
Autonomous PUFFER (A-PUFFER) Completed 5 Sensing for Robotic Systems Jet Propulsion Laboratory 2025-12-18 —
Hydrocarbon Cold-Flow Simulation of LOX/LH2 Rocket Aerodynamics Completed 3 Hybrids Stennis Space Center 2025-12-18 —
Armstrong Flies on Mars, Titan, and Venus: Developing Innovative Tools and leveraging center expertise to explore the universe. Completed 5 Software, Modeling, Simulation, and Information Processing Armstrong Flight Research Center 2025-12-18 —
Novel Dynamical Analysis of Spacecraft Operating in Close Proximity to Active Comets Completed 3 Dynamics Analysis, Modeling, and Simulation Tools University of Colorado Boulder 2025-12-18 —
A Synthetic Biology Architecture to Detoxify and Enrich Mars Soil for Agriculture Completed 3 Architecture Design and Analysis University of California-Berkeley 2025-12-18 —
Two-Dimensional Planetary Surface Landers Completed 1 Above-Surface Mobility Jet Propulsion Laboratory 2025-12-18 —
Beamed Microwave Energy Propulsion Leveraging Lunar Resources and Dual-Use Infrastructure Systems Completed 2 Nuclear Thermal Propulsion Pennsylvania State University-Main Campus 2025-12-18 —
Increasing NASA SSC Range Safety by Developing the Framework to Monitor Airspace and Enforce Restrictions Project Completed 4 — Stennis Space Center 2025-12-18 —
Torpor Inducing Transfer Habitat For Human Stasis To Mars Completed 1 Supersonic Retropropulsion SpaceWorks Enterprises, Inc. (SEI) 2025-12-18 —
Dust Mitigation (DM) Completed 5 Particulate Contamination Prevention and Mitigation Kennedy Space Center 2025-12-18 —
Fabrication of Multifunctional BN Fine Fibers by Forcespinning Method Completed 2 Lightweight Structural Materials Glenn Research Center 2025-12-18 —
Robotic Construction of Hierarchical Truss Structures for Ultra-light Starshades Completed 3 Manufacturing Processes Ames Research Center 2025-12-18 —
Methane Metabolism by Yeast Completed 3 — Ames Research Center 2025-12-18 —
Dependable Neural Networks for Identifying Anomalous Behavior in Real-Time Operations, Year 1 Completed 3 Traffic Management Concepts Jet Propulsion Laboratory 2025-12-18 —
Leveraging Chaos in Mission Design Completed 3 Tools and Methodologies for Defining Mission Architectures and Mission Design Stanford University 2025-12-18 —
GNSS Sub-cm Real-Time Precise Point Positioning (GNSS SCRIPPS*), Year 2 Completed 4 Software Development, Engineering, and Integrity Jet Propulsion Laboratory 2025-12-18 —
High-frequency surface and near-surface temperature measurements of burning composite propellants Completed 3 Solids Purdue University-Main Campus 2025-12-18 —
High-Fidelity Process Model to Enable Additive Manufacturing of Complex Shape Structures Completed 3 Computational Materials Ames Research Center 2025-12-18 —
CubeSat Deformable Mirror Demonstration Completed 3 Optical Components Massachusetts Institute of Technology 2025-12-18 —
3D Additive Construction with Regolith for Surface Systems Completed 3 In Situ Manufacturing, Maintenance, and Repair Kennedy Space Center 2025-12-18 —
Structural Modifications of Continuous Aerogel Films for Low-power, High Performance Sensing Capabilities Completed 3 Other Sensors and Instruments Ohio State University-Main Campus 2025-12-18 —
Liquefied Bleed for Stability and Efficiency of High Speed Inlets Completed 3 — Glenn Research Center 2025-12-18 —
Modular Load-Limiting Device for 3G MAR Completed 5 Touchdown Systems Armstrong Flight Research Center 2025-12-18 —
Rapid Injector Advancement for Rotating Detonation Rocket Engines Completed 2 Airbreathing Pressure Gain Combustion University of Alabama in Huntsville 2025-12-18 —
Advanced Additive Manufacturing Feedstock from Molten Regolith Electrolysis Completed 3 Manufacturing Processes Kennedy Space Center 2025-12-18 —
Iron Fluoride Cathode for Li Battery Technology Completed 2 Electrochemical Storage: Batteries Glenn Research Center 2025-12-18 —
Terahertz Phase Shifters for Electronic Steering of Radars and Radiometers, Year 2 Completed 3 Microwave, Millimeter Waves, and Submillimeter Waves Jet Propulsion Laboratory 2025-12-18 —
Photonic Coronagraphs for Direct Imaging of Exoplanets Completed 2 Optical Components Ames Research Center 2025-12-18 —
Cryogenic Ice Penetration Mechanics for Investigating the Existence of Life on the Jupiter Moon Europa Project Completed 3 — Glenn Research Center 2025-12-18 —
In-Situ Detection of Volcanic Ash Completed 4 Environment Sensors Glenn Research Center 2025-12-18 —
← Previous Page 161 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.