Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,176 projects harvested so far — page 369 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
1040nm 3-D imaging CASALS Lidar for Landing and Long-Distance Navigation Completed 4 Revolutionary PNT Technologies Goddard Space Flight Center 2026-04-14 —
Passive fabrication of FUV bandpass filters for HWO spectrograph instrumentation Completed 4 Optical Components Goddard Space Flight Center 2026-04-14 —
Physical vapor deposition coating uniformity optimization for HWO viability assessment Completed 7 Coatings Goddard Space Flight Center 2026-04-14 —
Automated Design and Placement of Printed Hybrid Electronics Completed 6 Additive Manufacturing Goddard Space Flight Center 2026-04-15 —
3D Printable Bioreactor for Food Production Completed 3 Food Production, Processing, and Preservation Ames Research Center 2026-04-15 —
Novel Recuperator Design for Cryogenic Fluid Management System Completed 2 Cryogenic Propulsion Marshall Space Flight Center 2026-04-15 —
NASA TechLeap Prize: Nighttime Precision Landing Challenge No. 1 Completed 5 Landing Armstrong Flight Research Center 2026-04-15 —
Life Support Systems: Environmental Monitoring Active 5 Air, Water, Microbial, and Acoustic Sensors Johnson Space Center 2026-04-15 Medium
Lunar GNSS Receiver Experiment (LuGRE) Completed 8 Communications, Navigation, and Orbital Debris Tracking and Characterization Systems Goddard Space Flight Center 2026-04-16 —
3D Printed Habitat - Design Competition Completed 5 Surface Construction and Assembly Kennedy Space Center 2026-04-20 —
Asteroid Data Hunter Completed 3 Software Modeling and Model Checking NASA Headquarters 2026-04-20 —
Aftershock: NASA Shock Propagation Prediction Challenge Completed 4 Tests, Tools, and Methods Langley Research Center 2026-04-20 —
Advanced Lightweight Lunar Gantry for Operations (ALLGO) Completed 2 Surface Construction and Assembly Langley Research Center 2026-04-20 —
Radiation Tolerant Displays Active 4 Flight Computing and Avionics Johnson Space Center 2026-04-21 Medium
Space Tether Completed 4 Structures Marshall Space Flight Center 2026-04-21 —
Mars Ascent Vehicle I Completed 5 Instrumentation and Health Monitoring for EDL Marshall Space Flight Center 2026-04-21 —
Dust Vacuum System (DVS) Active 4 Particulate Contamination Prevention and Mitigation Johnson Space Center 2026-04-22 Medium
Thermal Radiator with Electrodynamic Dust Shield (EDS) (TREDS) Active 4 Particulate Contamination Prevention and Mitigation Kennedy Space Center 2026-04-22 Medium
Small Spacecraft Electric Propulsion System (SmallEP-ACO) Completed 5 Electrostatic Propulsion — 2026-04-23 —
Mini-MARLI, a small lidar for measuring of atmospheric wind and dust profiles from Mars Orbit Completed 3 Sensors and Instruments Goddard Space Flight Center 2026-04-24 —
SmallSat Innovation, Development, & Readiness (SIDR) Center Completed 2 Flight and Ground Testing Methodologies Marshall Space Flight Center 2026-04-24 —
Radiation Tolerant Displays Active 4 Radiation-Hardened Extreme-Environment Components and Implementations Johnson Space Center 2026-04-27 Medium
Mars Exercise System Active 2 Prevention and Countermeasures Johnson Space Center 2026-04-28 High
Urban Air Taxi Visual Study Tool Development Completed 3 Safe All-Vehicle Access Armstrong Flight Research Center 2026-04-29 —
NASA TechLeap Prize: Autonomous Observation Challenge No. 1 Completed 5 Observatories Armstrong Flight Research Center 2026-04-29 —
Hypervelocity Expansion Tunnel for Human-rated Entry Vehicles Completed 2 Ground and Flight Test Technologies Ames Research Center 2026-04-29 —
Honey, I Shrunk the NASA Payload Completed 2 Remote Sensing Instruments and Sensors Jet Propulsion Laboratory 2026-04-29 —
CC22 Ultralight Starshade Completed 3 Sensors and Instruments Goddard Space Flight Center 2026-04-29 —
CC23 Adaptable Radiometric Measuring System (ARMS) Completed 3 Cryogenic/Thermal Systems Armstrong Flight Research Center 2026-04-29 —
Microgravity Ullage Trapping Technology (MUTT) Active 4 Integrated Systems and Ancillary Technologies Carthage College 2026-04-30 Medium
Hardware for Extraction and Reagent Mixing in Experimental Studies (HERMES) Active — Sample Handling Ecoatoms, Inc. 2026-04-30 —
IMPRESS: Iterative Mars Penetrator for Subsurface Science Active 2 Touchdown Systems Guinn Partners 2026-04-30 High
Cellular Experiment Laboratory System (CELS) Active 3 Medical Diagnosis and Prognosis Helogen Corporation 2026-04-30 High
Technology Demonstration of Graphene Ion Membranes for Earth and Space Applications Completed 3 Detectors and Focal Planes Johns Hopkins University: Applied Physics Laboratory 2026-04-30 —
High-Cadence Microgravity Silicon Semiconductor Crystal Manufacturing Active — Flight Mechanics Testing and Flight Operations SpaceWorks Enterprises, Inc. (SEI) 2026-04-30 —
Zero-g Slosh Model Technology: Knowledge Payload Completed 6 Integrated Systems and Ancillary Technologies Purdue University-Main Campus 2026-04-30 —
Honey Bubble Excitation Experiment (H-BEE) for Lunar Molten Regolith Analog Demonstration Completed 4 Environment Sensors Honeybee Robotics, Ltd. 2026-04-30 —
Spaceflight Testing of FEMTA Micropropulsion System for Interplanetary Smallsat Completed 6 Cold Gas Purdue University-Main Campus 2026-04-30 —
Evaluation of Computed Axial Lithography for rapid, volumetric additive manufacturing under low-gravity conditions Completed 4 Manufacturing Processes University of California-Berkeley 2026-04-30 —
Rocket Lab USA, Inc. Proposal to the National Aeronautics and Space Administration (NASA) Space Technology Announcement of Collaborative Opportunity (ACO) Completed 4 Touchdown Systems Rocket Lab USA, Inc. 2026-04-30 —
Dust In-situ Manipulation System (DIMS) (DIMS) Active 4 Atmosphere Revitalization University of Central Florida 2026-04-30 Medium
Testing a Novel Technology for a Key Material Property Measurement- Application to Advanced Manufacturing in Space Active 4 Tests, Tools, and Methods University of Florida 2026-04-30 Medium
Strata-2P - characterizing sensor-regolith interactions in reduced-gravity Completed 6 Sample Handling University of Central Florida 2026-04-30 —
Spacecraft Pointing Control and Zero-gravity Slosh – Knowledge Payload Completed 5 Integrated Systems and Ancillary Technologies Purdue University-Main Campus 2026-04-30 —
Integrated Remote Imaging System - UltraViolet Active 4 Detectors and Focal Planes Johns Hopkins University: Applied Physics Laboratory 2026-04-30 Medium
In-Space Coating Development Utilizing Atomic Layer Deposition (ALD) (ALD) Completed 4 Mirror Systems Goddard Space Flight Center 2026-04-30 —
Lander-style Vehicle Plume-structure Heat Transfer Monitoring Knowledge Payload Completed 4 Instrumentation and Health Monitoring for EDL Purdue University-Main Campus 2026-04-30 —
Flight test of Spacecraft Black Box Technology modules for Commercial Spacecraft Completed 6 Range Tracking, Surveillance, and Flight Safety Technologies FAA-AST 2026-04-30 —
Electrodynamic Regolith Conveyor Completed 4 Sample Acquisition and Handling Kennedy Space Center 2026-04-30 —
IRIS - an Integrated Remote Imaging System - External environment remote sensing from suborbital reusable launch vehicles Completed 6 Advanced Commercial-off-the-Shelf Technologies Johns Hopkins University: Applied Physics Laboratory 2026-04-30 —
← Previous Page 369 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.