Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 43 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
Entry Systems Modeling (ESM): FUN3D Development Completed 7 Integrated Modeling and Simulation for EDL Ames Research Center 2024-02-21 —
National Robotics Initiative (NRI): Long-Range Prediction of Non-Geometric Terrain Hazards for Reliable Planetary Rover Traverse Completed 3 State Estimation Johnson Space Center 2024-02-21 —
Human Robotic Systems (HRS): Controlling Robots over Time Delay: Develop RAPID robot messaging for unified cross-center operations platform for TDM, xGDS, and CCSDS Completed 5 Execution and Control Johnson Space Center 2024-02-21 —
Solar Arrays for LILT and High-Radiation Environments Completed — Photovoltaic Electrical Power — 2024-02-21 —
Affordable Vehicle Avionics (AVA): Guidance, Navigation and Control Completed 5 Aerodynamic Decelerators Ames Research Center 2024-02-21 —
National Robotics Initiative (NRI): Active Skins for Simplified Tactile Feedback in Robotics Completed 3 Grappling Technologies Johnson Space Center 2024-02-21 —
Transformational Solar Array for Extreme Environments Completed — Photovoltaic Electrical Power — 2024-02-21 —
National Robotics Initiative (NRI): Actuators for Safe, Strong, and Efficient Humanoid Robots Completed 3 Control Force and Torque Actuators Johnson Space Center 2024-02-21 —
Human Robotic Systems (HRS): Robotic Technologies for Asteroid Missions: HRS - Develop Prototype Tendon-Actuated Manipulators to Enable In-Space Operations Completed 3 Dexterous Manipulation Johnson Space Center 2024-02-21 —
Mars Science Laboratory Entry Descent and Landing Instrument (MEDLI) 2: 1. Backshell Heat Flux Measurements Completed 5 Integrated Modeling and Simulation for EDL Langley Research Center 2024-02-21 —
National Robotics Initiative (NRI): Building the Robotic Commons - Open Source Robotics Foundation (OSRF) Completed 4 Robot Software Johnson Space Center 2024-02-21 —
Human Robotic Systems (HRS): Extreme Terrain Mobility: Complete Low Gravity Testbed using Tethered Stewart Platform Completed 4 Destination Resource Exploration Johnson Space Center 2024-02-21 —
In-Space Robotic Servicing (ISRS): Robotic Refueling Mission - Phase 1 Completed 7 Microgravity Construction and Assembly Goddard Space Flight Center 2024-02-21 —
In-Space Robotic Servicing (ISRS): Robotic Refueling Mission - Phase 3 Completed 4 Learning and Adaptation Goddard Space Flight Center 2024-02-21 —
Human Robotic Systems (HRS): Controlling Robots over Time Delay Completed — Training Johnson Space Center 2024-02-21 —
Quesst Community Test Planning & Execution (AAVP29) Active 3 Aeroacoustics Langley Research Center 2024-02-22 High
3D Printed Materials Characterization for Rapid Prototyping and Plant Growth (N/A) Completed 6 Food Production, Processing, and Preservation Kennedy Space Center 2024-04-16 —
Augmentation of Seed Film Technology with Probiotics in Support of Space Crop Production Completed 3 Food Production, Processing, and Preservation Kennedy Space Center 2024-04-16 —
Preliminary Computer Vision Datasets for Autonomous Aviation Completed 5 Autonomous Systems Armstrong Flight Research Center 2024-05-23 —
Acceptable Handling and Ride Qualities for Urban Air Mobility (UAM) Vehicles (AAVP31) Completed 3 Test and Qualification Environments Ames Research Center 2024-05-23 —
Reliable and Efficient Propulsion Components for UAM (AAVP22) Completed 2 All-Electric Propulsion Glenn Research Center 2024-05-23 —
Sounding Rocket Flight Computer Flight Software Baseline Completed 4 Software Development, Engineering, and Integrity Wallops Flight Facility 2024-05-29 —
Miniaturized, High-Reliability Quad-Core Processor Card Completed 4 Software, Modeling, Simulation, and Information Processing Goddard Space Flight Center 2024-05-29 —
Hermetic Laser Window for a Contamination Sensitive Mass Spectrometer Completed 5 Manufacturing Processes Goddard Space Flight Center 2024-05-30 —
VIrtual Super-resolution Optics with Reconfigurable Swarms (VISORS) Completed 2 Photovoltaic Electrical Power Goddard Space Flight Center 2024-05-30 —
Applying machine learning techniques to enhance the sensitivity and Selectivity of Multifunctional Sensor Platform Completed 3 Sensors and Instruments Goddard Space Flight Center 2024-05-30 —
High Resolution Mass Spectrometer Completed 2 Atomic and Molecular Species Assessment Goddard Space Flight Center 2024-05-30 —
Reaction Wheel for Sounding Rocket Payload Attitude Control Completed 3 Integrated Systems and Ancillary Technologies Wallops Flight Facility 2024-05-30 —
HNX/DragonTIGER Instrument Development: Position sensitive silicon particle detectors with accurate deposited energy measurement Completed 5 Measurement and Control Goddard Space Flight Center 2024-05-30 —
Liquid Crystal Facility (LCF) Completed 4 Special Materials Glenn Research Center 2024-06-05 —
Urban Air Mobility (UAM) Operational Fleet Noise Assessment (AAVP26) Completed 3 Aeroacoustics Langley Research Center 2024-06-17 —
Ion/Liquid Chromatography for Exploration of Solar System (ILCESS) (ILCESS) Completed 4 Atomic and Molecular Species Assessment The University of Texas at Arlington 2024-06-19 —
Multi-scale Methane Analytic Framework Completed 5 Modeling California Institute of Technology 2024-07-09 —
The Airborne Glacier and Land Ice Surface Topography Interferometer (GLISTIN-A and GLISTIN-H) Completed — Microwave, Millimeter Waves, and Submillimeter Waves NASA Headquarters 2024-07-09 —
Development of computational infrastructure to support hyper-resolution large-ensemble hydrology simulations from local-to-continental scales Completed 5 Exascale Simulation NASA Headquarters 2024-07-09 —
Fabry-Perot Interferometry for Cloud-Aerosol Transport System (CATS) Lidar Receiver Completed 4 Lasers NASA Headquarters 2024-07-09 —
A Black Array of Broadband Absolute Radiometers (BABAR) for Spectral Measurements of the Earth Completed 3 Detectors and Focal Planes National Institute of Standards and Technology 2024-07-09 —
A 2-micron Pulsed Laser Transmitter for Direct Detection Column CO2 Measurement from Space Completed 4 Lasers NASA Headquarters 2024-07-09 —
Very Long Wavelength Infrared Focal Plane Arrays for Earth Science Applications Completed 4 Detectors and Focal Planes California Institute of Technology 2024-07-09 —
CubeRRT: CubeSat Radiometer Radio Frequency Interference Technology Validation (CubeRRT) Completed 7 Microwave, Millimeter Waves, and Submillimeter Waves Ohio State University-Main Campus 2024-07-09 —
EPOS for Coordination of Asynchronous Sensor Webs Completed 6 Activity and Resource Planning and Scheduling NASA Headquarters 2024-07-09 —
Combined HSRL and Optical Autocovarience Wind Lidar Demonstration (HOAWL) Completed 4 Lasers NASA Headquarters 2024-07-09 —
Agile Big Data Analytics of High-Volume Geodetic Data Products for Improving Science and Hazard Response Completed 5 Science, Engineering, and Mission Data Life Cycle NASA Headquarters 2024-07-09 —
Pattern-based GIS for understanding content of very large Earth Science datasets Completed 5 Intelligent Data Understanding NASA Headquarters 2024-07-09 —
P/I band multi-frequency reflectometry antenna for a U-class constellation Completed 4 Innovative Antennas Purdue University-Main Campus 2024-07-09 —
Valid time-series analyses of satellite data to obtain statistical inference about spatiotemporal trends at global scales Completed 5 Information Processing and Artificial Intelligence University of Wisconsin-Madison 2024-07-09 —
Compact Midwave Imaging System Completed 5 Detectors and Focal Planes Johns Hopkins University: Applied Physics Laboratory 2024-07-09 —
AMIGHO: Automated Metadata Ingest for GNSS Hydrology within OODT (AMIGHO) Completed 5 Intelligent Data Understanding NASA Headquarters 2024-07-09 —
A deployable 4-meter 180 to 680 GHz antenna for the Scanning Microwave Limb Sounder (SMLS) Completed 5 Innovative Antennas NASA Headquarters 2024-07-09 —
Advanced Amplifier Based Receiver Front Ends for Submillimeter-Wave Sounders Completed 5 Electronics NASA Headquarters 2024-07-09 —
← Previous Page 43 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.