Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 169 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
Non-Contact Eddy Current Manipulation in Microgravity Environments Completed 3 Small-Body and Microgravity Mobility Cornell University 2025-12-18 —
Next-generation satellite-based lightning imager Completed 3 Optical Components Marshall Space Flight Center 2025-12-18 —
Autonomy Voice Assistants (AVA) Completed 3 Autonomous Systems Stennis Space Center 2025-12-18 —
50% Hydrogen Peroxide - Ethanol Monopropellant Development Completed 3 — Glenn Research Center 2025-12-18 —
3D Photocatalytic Air Processor for Dramatic Reduction of Life Support Mass and Complexity Completed 4 Manufacturing Processes Ames Research Center 2025-12-18 —
Kayhan Small Spacecraft Propulsion and Inspection Capability (SSPICY) Mission Concept Study (SSPICY Kayhan) Completed 4 Orbital Debris Characterization Kayhan Space Corp 2025-12-18 —
On-orbit Servicing, Assembly, and Manufacturing (OSAM) Architecture Simulation System (OASiS) Completed 2 Tools and Methodologies for Defining Mission Architectures and Mission Design Langley Research Center 2025-12-18 —
Improved Channel Decoders and New Low-Rate Codes for Space Communications Completed 3 Optical Communications Jet Propulsion Laboratory 2025-12-18 —
Acoustic Characterization and Database of Noise Control Treatments Completed 4 Structures Glenn Research Center 2025-12-18 —
Long Life Electric Propulsion for ESPA Class Spacecraft Completed 4 Electrostatic Propulsion Glenn Research Center 2025-12-18 —
Fast Optical Emission Spectroscopy for Plasma Modeling and Hall Thruster Development Completed 3 Electrostatic Propulsion University of Southern California 2025-12-18 —
Laser Metrology Edge Sensors Completed 3 Structures and Antennas Goddard Space Flight Center 2025-12-18 —
Multiscale Modeling of 3D Woven Composite Structures Optimized to Minimize Process-Induced Damage Completed 2 Computational Materials University of Massachusetts-Lowell 2025-12-18 —
3D Printed Habitat - On-Site Habitat Competition Completed 3 Surface Construction and Assembly Kennedy Space Center 2025-12-18 —
Rotating Detonation Rocket Engine Cycle Design Tool Completed 3 Integrated Modeling and Simulation for EDL Glenn Research Center 2025-12-18 —
Leading Edge Irradiation Assembly (LEIA) Completed 6 Thermal Management Systems Armstrong Flight Research Center 2025-12-18 —
Lightweight and Flexible Metal Halide Perovskite Thin Films for High Temperature Solar Cells Completed 3 Photovoltaic Electrical Power University of Virginia-Main Campus 2025-12-18 —
Small Volume Dual Propulsion System Completed 4 Propulsion Systems Marshall Space Flight Center 2025-12-18 —
Femtosecond laser inscription Completed 3 Optical Components Goddard Space Flight Center 2025-12-18 —
Cleaning Mirrors & Lenses with Electrons (no vacuum chamber required) Completed 4 — Goddard Space Flight Center 2025-12-18 —
Space-Borne Ultra Low Noise Clock and Ground-Space optical clock time transfer for VBLI telescope and High Precision Clock Enabled Astrophysics Completed 3 Remote Sensing Instruments and Sensors Goddard Space Flight Center 2025-12-18 —
Investigation of Metal Solvent Assisted CVD Growth of 4H-SiC Completed 4 — Glenn Research Center 2025-12-18 —
Lunar Plants Prototype for Moon Express Completed 5 — Ames Research Center 2025-12-18 —
IPAD Paperless Work Control for Test Complex Facilities Management Project Completed 7 Ground and Surface Logistics Stennis Space Center 2025-12-18 —
Graphene-GaN Schottky Photodiodes Completed 3 Detectors and Focal Planes Goddard Space Flight Center 2025-12-18 —
Coiled Brine Recovery Assembly, Year 1 (CoBRA) Completed 3 Water Recovery and Management Johnson Space Center 2025-12-18 —
Moon Tycoon Version 2: A Detailed 3D Lunar Simulation in Virtual Reality Completed 5 Software Modeling and Model Checking Kennedy Space Center 2025-12-18 —
Next generation global atmospheric water content observations leveraging Starlink constellation Completed 3 Remote Sensing Instruments and Sensors Langley Research Center 2025-12-18 —
Ion-Trap Mass Spectrometry for the Potassium-Argon Laser Experiment (KArLE) Canceled 5 — Marshall Space Flight Center 2025-12-18 —
Radiation Shielding Utilizing High Temperature Superconducting Magnets Completed 1 Protection Systems Johnson Space Center 2025-12-18 —
Propulsion System and Second Stage Structural Loads Interaction Test Platform at SSC E3-C2 Completed 4 — Relativity Space, Inc. 2025-12-18 —
CubeSat Constellation Design for Air Traffic Monitoring Completed 6 — Ames Research Center 2025-12-18 —
A Novel Electrostatic/Microstructured Adhesive with Dust Mitigation Capabilities Completed 4 Grappling Technologies Illinois Institute of Technology 2025-12-18 —
Science Data Understanding for Autonomous Rover Exploration Completed 3 Management and Control Carnegie Mellon University 2025-12-18 —
Wireless Battery-Free Real-time Aviator Biosensing Completed 5 Contactless and Wearable Human Health and Performance Monitoring Armstrong Flight Research Center 2025-12-18 —
Testing a Novel Geopolymer Binder as a Refractory Material for Rocket Plume Environments at SSC Completed 4 — Stennis Space Center 2025-12-18 —
Ultralight Core Shell Architectures for Aerospace Applications Completed 3 Lightweight Structural Materials Rice University 2025-12-18 —
Shadow-Chaser: A Small Satellite Concept to Probe Planetary Atmospheres Using Stellar Occultations Completed 3 Observatories Langley Research Center 2025-12-18 —
Biomedical Monitoring by a Novel Noncontact Radio Frequency Technology, Year 1 Completed 3 Medical Diagnosis and Prognosis Kennedy Space Center 2025-12-18 —
Laser Additive Technique Tailored for Ir Catalyst Engineering (LATTICE) Completed 5 Propulsion Systems Marshall Space Flight Center 2025-12-18 —
Grain Boundary Engineering of Thermoelectrics for RTGs Completed 2 Special Materials Northwestern University 2025-12-18 —
Instantaneous Clarity of Ambient Environment Capability (ICAN-C) Completed 3 Human Health, Life Support, and Habitation Systems Marshall Space Flight Center 2025-12-18 —
PRANDTL-D Sub-Scale Glider Completed 4 — Armstrong Flight Research Center 2025-12-18 —
High Performance, High Temperature Thermoelectrics Completed 4 — Marshall Space Flight Center 2025-12-18 —
A Ground-Based Analog for CNS Exposure to Space Radiation: A System for Integrating Microbeam Technology and Neuronal Culture Completed 3 Radiation Transport and Risk Modeling Massachusetts Institute of Technology 2025-12-18 —
Laser Power for Lunar Polar Exploration Completed — Other Advanced Concepts for Generating and Converting Power Glenn Research Center 2025-12-18 —
Correlated Electromagnetic Levitation Actuator, Year 1 Completed 6 — Marshall Space Flight Center 2025-12-18 —
Regolith Cladding for Flame-Resistance Completed 3 Materials, Structures, Mechanical Systems, and Manufacturing Marshall Space Flight Center 2025-12-18 —
Atomistic Design for Thermal Transport From First Principals Completed 3 Digital Transformation Technologies for Manufacturing Cornell University 2025-12-18 —
Dynamic Epoxy Concretes for Extraterrestrial Habitats Completed 2 Lightweight Structural Materials Northwestern University 2025-12-18 —
← Previous Page 169 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.