Illustration of a technology project blueprint with a gear, a lightbulb, and a TRL progress bar

NASA Technology Projects

Search NASA's TechPort inventory — every technology R&D project the agency has tracked, active and completed. Harvested gradually in the background (TechPort only exposes one project per API call, ~21,000 total), so the list grows over time rather than all at once.

What's active and early-stage — where getting involved could matter →

21,172 projects harvested so far — page 194 of 424.

Title Status TRL Technology area Lead organization Last updated Potential ⓘ
Flow Boiling in Microgap Coolers - Validation via Suborbital Flight, Year 4 Completed 5 Lasers Goddard Space Flight Center 2025-12-18 —
Further Development of Aperture: A Precise Extremely Large Reflective Telescope Using Re-configurable Elements Completed 2 Mirror Systems Northwestern University 2025-12-18 —
Electrochemical Approach to ID Bacteria Completed 1 — Johnson Space Center 2025-12-18 —
Dusty Plasma Fission Fragment Propulsion Completed 3 — Marshall Space Flight Center 2025-12-18 —
Ultra-low thermal stability of Gallium Nitride (GaN) power devices Completed 7 Advanced Commercial-off-the-Shelf Technologies Marshall Space Flight Center 2025-12-18 —
Formation Flying with a Beach Ball Coronagraph Completed 4 — Goddard Space Flight Center 2025-12-18 —
Learning Agent for Autonomous Spacecraft Activity Planning and Orbit Selection Completed 3 Activity and Resource Planning and Scheduling University of Colorado Boulder 2025-12-18 —
Utilizing Surface Acoustic Waves for Rapid Heating in Lithium-Ion Batteries Completed 2 Electrochemical Storage: Batteries University of California-San Diego 2025-12-18 —
Thermal effects in plume-surface interaction during a powered descent landing Completed 2 Integrated Modeling and Simulation for EDL Johns Hopkins University 2025-12-18 —
Integrated Low Temperature CO2 and H2O Electrolysis Completed 3 Resource Processing for Production of Mission Consumables Glenn Research Center 2025-12-18 —
Capacitive Mass Guaging for Cyrogenic Fluids in Micro-g (CAPMAG) Completed 6 In-Space Propellant Storage and Use Kennedy Space Center 2025-12-18 —
In-Situ Production of Cementitious Material from Martian Resources, Year 2 Completed 3 In Situ Manufacturing, Maintenance, and Repair Marshall Space Flight Center 2025-12-18 —
Bio-inspired Thermal Exchange System for Spacecraft Completed 2 Thermal Protection Materials Glenn Research Center 2025-12-18 —
Exploration of Bio-Inspired Acoustic Metasurface-Based Absorbers Completed 3 Aeroacoustics Glenn Research Center 2025-12-18 —
Design of Refractory Alloys for Processing by Additive Manufacturing and Service at Extremely High Temperatures Completed 4 Manufacturing Processes Carnegie Mellon University 2025-12-18 —
Development of an X-ray tube for planetary instruments Completed 6 Decompression Sickness Mitigation Ames Research Center 2025-12-18 —
Solid State Ultra Capacitor, Year 1 Completed 4 — Marshall Space Flight Center 2025-12-18 —
Small Satellite Modular ADCS Completed 4 — Marshall Space Flight Center 2025-12-18 —
Regolith-Derived Heat Shield for Planetary Body Entry and Descent System with In Situ Fabrication Completed 3 — Kennedy Space Center 2025-12-18 —
Solid Polymer Nanocomposite Battery Electrolyte Completed 3 Electrochemical Storage: Batteries Glenn Research Center 2025-12-18 —
Critical 2D-to-3D Transformation of NASA's VESGEN Software for Astronaut Health Countermeasures and Terrestrial Medicine/Ecological Commercialization Completed 3 — Ames Research Center 2025-12-18 —
Novel Control Techniques for Hand and Wrist Robotic Rehabilitation Completed 3 Dexterous Manipulation Rice University 2025-12-18 —
Solid Lithium Ion Conductors (SLIC) for Lithium Solid State Batteries Completed 3 Electrochemical Storage: Batteries Jet Propulsion Laboratory 2025-12-18 —
AI-Enhanced Microweather Nowcasting for Safe Urban Air Mobility Completed 3 Weather and Environment Langley Research Center 2025-12-18 —
Development of an integrated system for cell analysis and profiling by capillary electrophoresis-mass spectrometry Completed 3 Environment Sensors University of Kansas 2025-12-18 —
FAME: Fast Affordance Manipulation Execution Completed 3 Dexterous Manipulation University of Michigan-Ann Arbor 2025-12-18 —
In situ sensor for accurate measurement of extinction coefficients and lidar ratios of aerosols and clouds Completed 4 Sensors and Instruments Ames Research Center 2025-12-18 —
Using Graphics Processing Units to Accelerate CFD Simulations Requiring General Gas Chemistry Completed — Integrated Modeling and Simulation for EDL Langley Research Center 2025-12-18 —
Fluidic Telescope: Enabling the Next Generation of Large Space Observatories (FLUTE) Completed 3 Manufacturing Processes Ames Research Center 2025-12-18 —
Broadband Laser Source and Spectrally Resolved Detection for Spectroscopic LiDAR Instrument Completed 2 Lasers Goddard Space Flight Center 2025-12-18 —
Low Temperature Atmospheric Pressure Plasma Sterilization Shower, Year 2 Completed 4 — Ames Research Center 2025-12-18 —
Structured Sorbents: Rapid Cycle Temperature Swing Adsorption (TSA) Completed 4 Atmosphere Revitalization Marshall Space Flight Center 2025-12-18 —
Autonomous Landing and Proximity Operation Technology for Poorly-Characterized Small Bodies Active 2 Touchdown Systems Georgia Institute of Technology-Main Campus 2025-12-18 High
Characterization of Plasmadynamics within a Small Magnetic Nozzle Completed 3 Electromagnetic Propulsion University of Michigan-Ann Arbor 2025-12-18 —
Electrified Liquid Jets from Nanostructured Surfaces for Phase Change Heat Transfer Enhancement Completed 3 Heat Transport Georgia Institute of Technology-Main Campus 2025-12-18 —
In-Space Manufacturing, Assembly, and Repair Technologies for Space Structures (I-SMART) Completed 3 Manufacturing Processes Glenn Research Center 2025-12-18 —
Space-based Human Reliability Analysis Development, Year 2 (HRA) Completed 3 Human Factors Engineering Johnson Space Center 2025-12-18 —
Development of a Wave Front Control system for space utilizing MEMS Deformable Mirrors Completed 5 — Ames Research Center 2025-12-18 —
Forceful manual manipulation with millirobot ensembles on unreliable substrates Completed 3 Collaborative Mobility University of California-Berkeley 2025-12-18 —
Development of High-Energy and Low-Cost Semi-Solid Sodium Batteries Operating at Extreme Cold Temperatures Completed 3 Electrochemical Storage: Batteries Dartmouth College 2025-12-18 —
Magnetic and low-dissipation applications of topological materials at limited dimensions Completed 3 Electronic Packaging and Implementations Yale University 2025-12-18 —
Apollo Regolith Thermally Constrained Landing Pad Bricks (ARTC Bricks) Completed 2 Resource Processing for Production of Manufacturing, Construction, and Energy Storage Feedstock Materials The University of Texas at San Antonio 2025-12-18 —
Advanced Applications of Generative Design and Digital Manufacturing Completed 4 Multiscale, Multiphysics, and Multifidelity Simulation Goddard Space Flight Center 2025-12-18 —
Lunar lander Fuel Cell (LFC-ACO) Completed 5 Electrochemical Storage: Fuel Cells Blue Origin, LLC 2025-12-18 —
Diffractive Solar Sailing Completed 4 Solar Sails Johns Hopkins University: Applied Physics Laboratory 2025-12-18 —
Fission Fragment Dust Experiment Completed 4 — Marshall Space Flight Center 2025-12-18 —
Design and Fabrication of a Novel Paper Based Biosensor for Health Diagnostics, Year 2 Completed 3 — Ames Research Center 2025-12-18 —
Graphene Transparent Conductive Electrodes Completed 3 — Goddard Space Flight Center 2025-12-18 —
Economical Access to Space, Year 1 Completed 5 — Armstrong Flight Research Center 2025-12-18 —
Dependable Neural Networks for Identifying Anomalous Behavior in Real-Time Operations, Year 2 Completed — Intelligent Data Understanding Jet Propulsion Laboratory 2025-12-18 —
← Previous Page 194 of 424 Next →

ℹ️ About this data
  • Sourced from NASA TechPort, NASA's public technology-project inventory. Harvested gradually into our own database — TechPort's API only returns one project's full detail per call, so ~21,000 projects take a while to cover.
  • TRL (Technology Readiness Level) is NASA's 1-9 scale for how mature a technology is: 1-3 is basic research/concept, 4-6 is lab/relevant-environment validation, 7-9 is flight-proven. Lower TRL generally means more room for outside research contribution; higher TRL means something closer to a finished, licensable technology.
  • "Active" vs "Completed" reflects TechPort's own project status, not funding availability — see the insights page for how to actually act on this.
  • Contribution potential is our estimate, not NASA data: an Active project at a low TRL has more room for outside research involvement than a flight-proven one. High = Active + TRL 1-3, Medium = Active + TRL 4-6, Low = Active + TRL 7-9. "Active" does not mean NASA is seeking external contributors or that funding exists — treat this purely as a shortlisting aid.
  • Last updated is TechPort's own lastUpdated date for the project. "Recently harvested" instead sorts by when we pulled the record into our database, which clusters within the initial harvest window and is far less meaningful — prefer "Recently updated (NASA)".
💻 Show API usage example (cURL)
curl -sS "https://devops.majbase.com/nasa-tech-projects/api?q=laser&status=Active&sort=trl&page=1"

Returns {"rows": [...], "total", "page", "pages"}, or {"error": "..."} if temporarily unavailable. All query params are optional.